PIP-II is an essential upgrade of the Fermilab complex that will enable the worlds most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and support a broad physics program at Fermilab. Ultimately, the PIP-II superconducting linac will be capable of accelerating the $H-$ CW beam to 800 MeV with an average power of 1.6 MW. To operate the linac with such high power, beam losses and beam emittance growth must be tightly controlled. In this paper, we present the results of global optimization of the Linac options towards a robust and efficient physics design for the superconducting section of the PIP-II linac. We also investigate the impact of the nonlinear field of the dipole correctors on the beam quality and derive the requirement on the field quality using statistical analysis. Finally, we assess the need to correct the quadrupole focusing produced by Half Wave, and Single Spoke accelerating cavities. We assess the feasibility of controlling the beam coupling in the machine by changing the polarity of the field of linac focusing solenoids
PIP-II is the Fermilab's flagship project for providing powerful, high-intensity proton beams to the laboratory's experiments. The heart of PIP-II is an 800-MeV superconducting linac accelerator. It will be located in a new tunnel with new service buildings and connected to the present Booster through a new transfer line. To support the design of civil engineering and mechanical integration, this paper provides preliminary estimation of radiation level in the gallery at an operational beam loss limit of 0.1 W/m, by means of Monte Carlo calculations with FLUKA and MARS15 codes.
The Proton Improvement Plan-II (PIP-II) [1] has been developed at Fermilab to provide powerful proton beams to the laboratorys experiments. An 800-MeV superconducting linear accelerator-a centerpiece of the project-is currently under construction in Batavia, Illinois (USA). After completion, the superconducting linac will be the starting point for the 1.2 MW (Phase 1) and 2.4-MW (Phase 2) proton beam that is needed for the Long-Baseline Neutrino Facility (LBNF) at Fermilab [2]. Due to unavoidable loss of a fraction of the beam in the accelerator components, a certain level of radiation will be…
The Fermilab Proton Improvement Plan (PIP) was formed in late 2011 to address important and necessary upgrades to the Proton Source machines (Injector line, Linac and Booster). The goal is to increase the proton flux by doubling the Booster beam cycle rate while maintaining the same intensity per cycle, the same uptime, and the same residual activation in the enclosure. For the Linac, the main focus within PIP is to address reliability. One of the main tasks is to replace the present hard-tube modulator used on the 200 MHz RF system. Plans to replace this high power system with a Marx-topology…
The Fermi National Accelerator Laboratory (FNAL) Linac has been in operation for 52 years. In approximately four years, it will be replaced by a new 800 MeV superconducting machine, the PIP-II SRF Linac. In the current configuration, the Linac delivers H- ions at 400 MeV and injects protons by charge exchange into the Booster synchrotron. Despite its age, the Linac is the most stable accelerator in the FNAL complex, reliably sending 22 mA in daily operations. We will discuss the status of the operation, beam studies, and plans.
Fermilab is developing a Proton Improvement Plan (PIP) to increase throughput of its proton source. The plan addresses hardware modifications to increase repetition rate and improve beam loss while ensuring viable operation of the proton source through 2025. The first phase of the PIP will enable the Fermilab proton source to deliver 1.8e17 protons per hour by mid-2013. As part of this initial upgrade, Fermilab plans to install a new front-end consisting of dual H- ion sources and a 201 MHz pulsed RFQ. This paper will present beam studies measurements of this new front-end and discuss new beam…
The PIP-II accelerator is a proposed upgrade to the Fermilab accelerator complex that will replace the existing, 400 MeV room temperature LINAC with an 800 MeV superconducting LINAC. Part of this upgrade includes a new injection scheme into the booster that levies tight requirements on the LLRF control system for the cavities. In this paper we discuss the challenges of the PIP-II accelerator and the present status of the LLRF system for this project.
The second phase accelerator for the Dual Axis Hydrodynamic Test facility (DARHT) is designed to provide an electron beam pulse that is 2 microsec long, 2kA, and 20 MeV in particle energy. The injector provides 3.2 MeV so that the linac need only provide 16.8 MeV. The linac is made with two types of induction accelerator cells. The first block of 8 cells have a 14 in. beam pipe compared to 10 in. in the remaining 80 cells. The other principal difference is that the first 8 cells have reduced volt-sec in their induction cores as a result of a larger diameter beam pipe. The cells are designed fo…
Fermilab is committed to upgrade its accelerator complex to support HEP experiments at the intensity frontier. The ongoing Proton Improvement Plan (PIP) enables us to reach 700 kW beam power on the NuMI neutrino targets. By the end of the next decade, the current 400 MeV normal conducting LINAC will be replaced by an 800 MeV superconducting LINAC (PIP-II) with an increased beam power >50% of the PIP design goal. Both in PIP and PIP-II era, the existing Booster is going to play a very significant role, at least for next two decades. In the meanwhile, we have recently developed an innovative bea…
The central part of PIP-II program of upgrades pro-posed for the Fermilab injection complex is an 800 MeV, 2 mA, CW-compatible SRF linac. Acceleration in super-conducting cavities begins from a low energy of 2.1 MeV, so that the first cryomodule, Half Wave Resonator (HWR) borders the warm Medium Beam Transport (MEBT) line. To minimize the amount of gas that may enter the SRF linac in a case if a vacuum failure occurs in the warm front end, a vacuum protection system is envisioned to be used in the PIP-II MEBT. It features a fast closing valve with two sensors and a differential pumping insert.…
Active discussion on the high energy physics priorities in the US carried out since summer of 2013 resulted in changes in Fermilab plans for future development of the existing accelerator complex. In particular, the scope of Project X was reduced to the support of the Long Base Neutrino Facility (LBNF) at the project first stage. The name of the facility was changed to the PIP-II (Proton Improvement Plan). This new facility is a logical extension of the existing Proton Improvement Plan aimed at doubling average power of the Fermilab's Booster and Main Injector (MI). Its design and required R&D…
The Proof-of-Principle (POP) prototype of the Rf-Focused Drift tube (RFD) linac structure is currently under test at Linac Systems, after years of delay due to a variety of technical problems. A discussion of these technical problems and their solutions will be presented. The status of these tests will be reported. Plans for future development of this linac structure will be revealed. Potential uses of this linac structure for a variety of scientific, medical, and industrial applications will be described, including: proton linac injectors for proton synchrotrons, compact proton linacs for PET…
The Fermilab Linac delivers 400 MeV H- beam to the rest of the accelerator chain. Providing stable intensity, energy, and emittance is key since it directly affects downstream machines. To counter fluctuations of Linac output due to various effects to be described below we are working on implementing dynamic longitudinal parameter optimization based on Machine Learning (ML). As inputs for the ML model, signals from beam diagnostics have to be well understood and reliable. In this paper we discuss the status and plans for ML-based optimization as well as preliminary results of diagnostics studi…
Over the past decade, Fermilab has focused efforts on the intensity frontier physics and is committed to increase the average beam power delivered to the neutrino and muon programs substantially. Many upgrades to the existing injector accelerators, namely, the current 400 MeV LINAC and the Booster, are in progress under the Proton Improvement Plan (PIP). Proton Improvement Plan-II (PIP-II) proposes to replace the existing 400 MeV LINAC by a new 800 MeV LINAC, as an injector to the Booster which will increase Booster output power by nearly a factor of two from the PIP design value by the end of…
In synchrotron machines, the beam extraction is accomplished by a combination of septa and kicker magnets which deflect the beam from an accelerator into another. Ideally the kicker field must rise/fall in between the beam bunches. However, in reality, an intentional beam-free time region (aka "notch") is created on the beam pulse to assure that the beam can be extracted with minimal losses. In the case of the Fermilab Booster, the notch is created in the ring near injection energy by the use of fast kickers which deposit the beam in a shielded collimation region within the accelerator tunnel.…
The Proton Improvement Plan, Stage Two (PIP-II) is a program of upgrades proposed for the Fermilab injection complex, which central part is an 800 MeV, 2 mA CW SRF linac. A prototype of the PIP-II linac front end called PIP-II Injector Test (PIP2IT) is being built at Fermilab. As of now, a 15 mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CW RFQ, followed by a 10 m Medium Energy Beam Transport (MEBT) have been assembled and commissioned. The MEBT bunch-by-bunch chopping system and the requirement of a low uncontrolled beam loss put stringent limitations on …
A lattice of single aperture superconducting variable field bending magnets is proposed as a cheap and practical way to recirculate the beams in recirculating linear accelerators. It is shown that the VFBM's can be configured to provide strong focusing in both transverse planes for the full range of beam momenta transported by the lattice.
Project-X is the proposed high intensity proton facility to be built at Fermilab, US. Its Superconducting Linac, to be used at first stage of acceleration, will be operated in continuous wave (CW) mode. The Linac is divided into three sections on the basis of operating frequencies & six sections on the basis of family of RF cavities to be used for the acceleration of beam from 2.5 MeV to 3 GeV. The transition from one section to another can limit the acceptance of the Linac if these are not matched properly. We performed a study to calculate the acceptance of the Linac in both longitudinal and…
As a part of the ongoing XIIth plan project titled "R&D activities for high energy proton linac based spallation neutron source", the work on physics design of various subsystems of the injector linac and accumulator ring has been taken up at RRCAT, Indore. For the 1 GeV H- injector linac, physics design studies of individual systems have been completed, and the end to end beam dynamics simulation studies have been performed to ensure that the stringent beam dynamics criteria are satisfied for the optimized lattice. Physics design studies to optimize the linear lattice of the accumulator ring …
FAST linear accelerator has been commissioned in 2017. Experimental program of the facility requires high quality beams with well-defined properties. Solenoidal fields at photoinjector, laser spot shape, space charge forces and other effects can distort beam distribution and introduce coupling. This work presents results of a beam phase space tomography for a coupled 4D case. Beam was rotated in two planes with seven quads by 180 degrees and images from YaG screen were used to perform SVD based reconstruction of the beam distribution.
Extensive beam-based feedback systems are planned as an integral part of the Next Linear Collider (NLC) control system. Wakefield effects are a significant influence on the feedback design, imposing both architectural and algorithmic constraints. Studies are in progress to assure the optimal selection of devices and to refine and confirm the algorithms for the system design. We show the results of initial simulations, along with evaluations of system response for various conditions of ground motion and other operational disturbances.
Three alternative designs of the European Spallation Source (ESS) high energy linac are described. The most promising ones are either a normalconducting (nc) coupled cavity linac (CCL) up tofinal energy or a change at 407 MeV to only one group of 6 cell superconducting (sc) elliptical cavities. Fully 3d Monte Carlo simulations are presented for both options, optimized for reduced halo formation at the linac end. For the error free matched case, especially the halo formation in the longitudinal plane is more pronounced for the hybrid solution with its superconducting cavities, caused by the una…
The Proton Improvement Plan II (PIPII) is a superconducting linear accelerator being built at Fermilab that will provide 800 MeV proton beams for neutrino production. The Linac requires cooling at 80 K, 5 K, and 2 K temperatures, which will be provided by cryogenic helium produced by a Helium Cryoplant and distributed by a Cryogenic Distribution System (CDS). Based primarily on the Linac heat load requirements at each temperature and the allowable pressure drop, we have made a preliminary thermodynamic design of the CDS. The design also incorporates special requirements such as controlled and …
In a long-term planning for neutrino experiments in China, a medium baseline neutrino beam is proposed which uses a CW superconducting linac of 15 MW in beam power as the proton driver. The linac will be based on the technologies which are under development by the China-ADS project, but with much weaker requirement on reliability. It is composed of a 3.2-MeV normal conducting RFQ and 5 different types of superconducting cavities. The nominal design energy and current are 1.5 GeV and 10 mA, respectively. The general considerations and preliminary results on the physics design will be presented …
The vibration stability requirements for the Next Linear Collider (NLC) are far more stringent than for the previous generation of Colliders. To meet these goals, it is imperative that the effects of vibration on NLC Linac components from near-field sources (e.g. compressors, high vacuum equipment, klystrons, modulators, pumps, fans, etc) be well understood. The civil construction method, whether cut-and-cover or parallel bored tunnels, can determine the proximity and possible isolation of noise sources. This paper presents a brief summary and analysis of recently completed and planned studies…
To achieve the physics goals of future Linear Colliders, it is important that electron and positron beams are polarized. The positron source planned for the International Linear Collider (ILC) is based on a helical undulator system and can deliver a polarised beam with positron polarization of 60%. To ensure that no significant polarization is lost during the transport of the electron and positron beams from the source to the interaction region, spin tracking has to be included in all transport elements which can contribute to a loss of polarization. These are the positron source, the damping …
During 1999, four 700-MHz, medium-beta (b = 0.64), superconducting radio frequency (SCRF) cavities for a high-intensity proton linac project at Los Alamos National Laboratory (LANL) were manufactured by industry. The SCRF cavities were designed by a LANL team in Los Alamos, New Mexico, USA, and manufactured at a CERCA plant in Romans, France. The cavities were made of 4-mm-thick, solid niobium sheets with a residual resistivity ratio (RRR) greater than 250. These niobium sheets were supplied by Wah Chang (USA), Heraeus AG (Germany), and Tokyo Denkai (Japan). The SCRF cavities were shipped to L…
The JAERI/KEK Joint Project for the high-intensity proton accelerator facility has been proposed with a superconducting (SC) linac option from 400 MeV to 600MeV. System design of the SC linac has been carried out based on the equipartitioning concept. The SC linac is planned to use as an injector to a 3GeV rapid cycling synchrotron (RCS) for spallation neutron source after it meets requirement to momentum spread less than +-0.1%. In the R&D work for SC cavities, vertical tests of single-cell and 5 cell cavities were performed. Experiments on multi-cell (5 cell) cavities of b=0.50 and b=0.89 at…
In the framework of the Eupraxia Design Study an advanced accelerator facility EUPRAXIA@SPARC_LAB has been proposed to be realized at Frascati (Italy) Laboratories of INFN. Two advanced acceleration schemes will be applied, namely an ultimate high gradient 1 GeV X-band linac together with a plasma acceleration stage to provide accelerating gradients of the GeV/m order. A FEL scheme is foreseen to produce X-ray beams within 3-10 nm range. A 500-TW Laser system is also foreseen for electron and ion production experiments and a Compton backscattering Interaction is planned together with extractio…
The treatment of flue gases from power plants and municipal or industrial wastewater using electron beam irradiation technology has been successfully demonstrated in small-scale pilot plants. The beam energy requirement is rather modest, on the order of a few MeV, however the adoption of the technology at an industrial scale requires the availability of high beam power, of the order of 1 MW, in a cost effective way. In this article we present the design of a compact superconducting accelerator capable of delivering a cw electron beam with a current of 1 A and an energy of 1 MeV. The main compo…
The Proton Improvement Plan-II (PIP-II, [1]) linac will include 35 Single Spoke Resonators type 2 (SSR2). A total of eight pre-production SSR2 jacketed cavities will be procured and five installed in the first pre-production cryomodule. The mechanical design of the jacketed cavity has been finalized and it will be presented in this paper along with fabrication and processing experience. The importance of interfaces, quality controls and procurement aspects in the design phase will be remarked as well as lessons learned during the fabrication process. Furthermore, development studies will be pr…
The PIP-II Injector Test 1 PIP2IT facility accelerator was assembled in multiple stages in 2014 $-$ 2021 to test concepts and components of the future PIPII linac that is being constructed at Fermilab. In its final configuration, PIP2IT accelerated a 0.55 ms x 20 Hz x 2 mA H$-$ beam to 16 MeV. To protect elements of the beam line, a Machine Protection System MPS was implemented and commissioned. The beam was interrupted faster than 10$μ$s when excessive beam loss was detected. The paper describes the MPS architecture, methods of the loss detection, procedure of the beam interruption, and opera…
The PIP-II linac will include thirty-six beta=0.61 and twenty-four beta=0.92 650 MHz 5 cell elliptical SRF cavities. Each cavity will be equipped with a tuning system consisting of a double lever slow tuner for coarse frequency tuning and a piezoelectric actuator for fine frequency tuning. The same tuner will be used for both the beta=0.61 and beta=0.92 cavities. Results of testing the cavity-tuner system for the beta=0.61 will be presented for the first time.
Fermilab is committed to upgrading its accelerator complex towards the intensity frontier to pursue HEP research in the neutrino sector and beyond. The upgrade has two steps: 1) the Proton Improvement Plan (PIP), which is underway, has its primary goal to start providing 700 kW beam power on NOvA target by the end of 2017 and 2) the foreseen PIP-II will replace the existing LINAC, a 400 MeV injector to the Booster, by an 800 MeV superconducting LINAC by the middle of next decade, with output beam intensity from the Booster increased significantly and the beam power on the NOvA target increased…
A series of beam dynamic studies were performed in 2020-2021 at the PIP-II Injector Test Facility (PIP2IT) that has been built to validate the concept of the front-end of the PIP-II linac being constructed at Fermilab. PIP2IT is comprised of a 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1- MeV CW RFQ, followed by a 10-m Medium Energy Beam Transport (MEBT), 2 cryomodules accelerating the beam to 16 MeV and a High-Energy Beam Transport (HEBT) bringing the beam to a dump. This paper presents beam dynamics - related measurements performed at PIP2IT such as the Twiss para…
In order to double the positron injection rate into the KEKB ring, a two-bunch acceleration scheme has been studied at the linac, in which bunches separated by 96 ns are accelerated in 50 Hz. In this scheme the stabilization of energy and orbit of each bunch is indispensable. Thus the beam energy and orbit feedback systems have been upgraded. Since beam characteristics are acquired through beam position monitors (BPM), their read-out system was improved to meet two-bunch requirements. Combined waveforms from BPM's were adjusted with delay cables avoiding overlaps and they enabled simultaneous …
A CW-compatible, pulsed H- superconducting linac "PIP-II" is being planned to upgrade Fermilab's injection complex. To validate the front-end concept, a test accelerator (The PIP-II Injector Test, formerly known as "PXIE") is under construction. The warm part of this accelerator comprises a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV Radio Frequency Quadrupole (RFQ) capable of operation in Continuous Wave (CW) mode, and a 10 m-long Medium Energy Beam Transport (MEBT). The paper will report on the installation of the RFQ and the first sections of the M…
The U.S. Particle Physics Project Prioritization Panel (P5) report encouraged the realization of Fermilab's Proton Improvement Plan II (PIP-II) to support future neutrino programs in the United States. PIP-II aims at enhancing the capabilities of the Fermilab existing accelerator complex while simultaneously providing a flexible platform for its future upgrades. The central part of PIP-II project is the construction of a new 800 MeV H- Superconducting (SC) Linac together with upgrades of the Booster and Main Injector synchrotrons. New transfer lines will also be needed to deliver beam to the d…
We present a detailed study of the six-dimensional phase space of the electron beam produced by the Cornell Energy Recovery Linac Photoinjector, a high-brightness, high repetition rate (1.3 GHz) DC photoemission source designed to drive a hard x-ray energy recovery linac (ERL). A complete simulation model of the injector has been constructed, verified by measurement, and optimized. Both the horizontal and vertical 2D transverse phase spaces, as well as the time-resolved (sliced) horizontal phase space, were simulated and directly measured at the end of the injector for 19 pC and 77 pC bunches …
Fermilab has developed a novel concept for an industrial electron linac using Nb3Sn coating technology and conduction cooling. These conduction-cooled linacs can generate electron beam energies up to 10 MeV in continuous-wave operation and reach higher power (>=1 MW) by combing several modules. Compact and light enough to mount on mobile platforms, our machine is anticipated to enable new in-situ environmental remediation applications such as waste-water treatment for urban areas, X-ray medical device sterilization, and innovative pavement applications. We highlight a few aspects of a 1 MW des…
Negative hydrogen ions are often used for injecting protons from linacs to storage rings via charge-exchange injection. In this process, the two electrons are stripped by a foil or laser to produce protons which can be merged with an existing beam without significantly affecting its dynamics, allowing high intensities of protons to be accumulated. However, this capability comes with the drawback that the outer electron of an H$^-$ ion has a low binding energy and can easily be stripped away prior to injection. This paper addresses the following stripping mechanisms: interactions with residual …