DUNE/LBNF时代费米实验室多兆瓦质子装置的设计考虑
Design Considerations for Fermilab Multi-MW Proton Facility in the DUNE/LBNF era
摘要:
Fermilab已经提交了两份Snowmass白皮书,内容涉及未来DUNE/LBNF的2.4~MW升级,其中包括PIP-II直线加速器的2 GeV扩展和新的快速循环同步加速器的建设。本文总结了这两个场景之间的关系,强调共同点,并跟踪其原始设计问题的差异。除了对两个2.4~MW升级方案的高度总结外,还简要讨论了分段、光束线能力、后续升级和相关研发。我们正在提出一个强有力的计划,以解决与每个场景相关的各种挑战,并选择最适合在未来几年提供质子束的概念。
英文摘要:
Fermilab has submitted two Snowmass whitepapers on a future 2.4~MW upgrade for DUNE/LBNF featuring a 2 GeV extension of the PIP-II linac and the construction of a new rapid-cycling-synchrotron. This paper summarizes the relationship between these two scenarios, emphasizing the commonalities and tracing the differences to their original design questions. In addition to a high-level summary of the two 2.4~MW upgrade scenarios, there is a brief discussion of staging, beamline capabilities, subsequent upgrades, and relevant R\&D. We are proposing a vigorous program to address various challenges associated with each scenario and to down-select the concept, most suitable to provide proton beams for years to come.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。