槟城岛大型度假中心的孤岛混合微电网系统的设计和实施,并适当应用多余的能量

Design and implementation of an islanded hybrid microgrid system for a large resort center for Penang Island with the proper application of excess energy

RMIT University(皇家墨尔本理工大学)

SK. A. Shezan, S. Rawdah, Shafin Ali, Ziaur Rahman

摘要:

由于文明的国际化和发展,能源需求每天都在加速增长。然而,适当经济地利用孤岛混合微电网系统(IHMS)产生的未被负载消耗的额外能量是一项重大的全球挑战。为了解决上述传票,本研究的重点是多个最佳组合的综合健康管理系统的槟榔屿山度假村位于槟榔屿,马来西亚,有效地利用多余的能源。为了有效地利用这些多余的能量,电加热器以及存储罐已被设计为具有适当的能量管理的分流负载。此外,系统设计采用HOMER Pro软件进行了有益的实用分析。此外,MATLAB Simulink通过表示2068和19,072 kW的值来稳定整个系统,这些值已被确定为度假村每天的近似峰值和平均负载。此外,优化的IHMS包括光伏(PV)电池、柴油发电机、风力涡轮机、蓄电池和转换器。与此相邻,优化的系统随后具有$21.66 million, Renewable Fraction (RF) of 27.8%, Cost of Energy (COE) of $ 0.165/kWh的净现值成本(NPC)、1,735,836 kg/年的CO2和每年517.29 MWh的过剩能量。由于柴油发电机引线系统被包括在该方案中,因此实现了$0.217/kWh, CO2 of 5,124,879 kg/year, and NPC of $ 2 325万的COE。电加热器作为分流负载有效地利用了多余的能量。

英文摘要:

The energy demand is growing daily at an accelerated pace due to the internationalization and development of civilization. Yet proper economic utilization of additional energy generated by the Islanded Hybrid Microgrid System (IHMS) that was not consumed by the load is a major global challenge. To resolve the above-stated summons, this research focuses on a multi-optimal combination of IHMS for the Penang Hill Resort located on Penang Island, Malaysia, with effective use of redundant energy. To avail this excess energy efficiently, an electrical heater along with a storage tank has been designed concerning diversion load having proper energy management. Furthermore, the system design has adopted the HOMER Pro software for profitable and practical analysis. Alongside, MATLAB Simulink had stabilized the whole system by representing the values of 2068 and 19,072 kW that have been determined as the approximated peak and average load per day for the resort. Moreover, the optimized IHMS is comprehended of Photovoltaic (PV) cells, Diesel Generator, Wind Turbine, Battery, and Converter. Adjacent to this, the optimized system ensued in having a Net Present Cost (NPC) of $21.66 million, Renewable Fraction (RF) of 27.8%, Cost of Energy (COE) of $0.165/kWh, CO2 of 1,735,836 kg/year, and excess energy of 517.29MWh per annum. Since the diesel generator lead system was included in the scheme, a COE of $0.217/kWh, CO2 of 5,124,879 kg/year, and NPC of $23.25 million were attained. The amount of excess energy is effectively utilized with an electrical heater as a diversion load.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑