arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 2104.13047eess.SYcs.SY
收藏

辅助服务获取模型:政策设计中考虑市场互动

Ancillary Services Acquisition Model: considering market interactions in policy design

Samuel Glismann

摘要:

迅速变化的电力部门需要调整和新的辅助服务,使电力系统能够安全可靠地运行。然而,关于辅助服务和市场设计的评估和政策建议缺乏评价市场和服务之间复杂互动的方法。因此,本文贡献了一个开源的基于代理的模型来测试辅助服务和电力市场的设计方案。辅助服务获取模型(ASAM)将基于代理的建模框架MESA与用于电力系统分析的Python工具箱(PyPSA)相结合。该模型为每个市场和代理商特定的策略提供了各种设计参数,并为前一天的市场,日内连续交易,再调度和不平衡提供了详细的清算算法。此外,ASAM包括许多政策性能指标,包括一个新的价格加价指标和新的再调度性能指标。一个程式化的仿真场景验证和验证了模型,并解决了再调度设计问题。研究结果表明,在多期全或无设计的再调度市场中,订单类型具有以下含义:(1)订单设计为市场各方提供了很少的风险,因为订单被完全清除。(2)大订单可能导致在交付期之前和之后的分派斜坡,并可能导致斜坡风险加价以及日内不平衡的额外交易。(3)在流动情况下的全或无设计导致电网运营商过度采购再调度,因为订单不能部分激活。此外,电网运营商可能通过不完全的再调度激活(即,向上和向下再调度量不相等)引起系统的不平衡。

英文摘要:

A rapidly changing electricity sector requires adjusted and new ancillary services, which enable the secure and reliable operation of the electricity system. However, assessments and policy advice regarding ancillary services and market design lack methods to evaluate the complex interaction of markets and services. Therefore, this paper contributes an open-source agent-based model to test design options for ancillary services and electricity markets. The Ancillary Services Acquisition Model (ASAM) combines the agent-based modeling framework MESA with the toolbox Python for Power System Analysis (PyPSA). The model provides various design parameters per market and agent-specific strategies as well as detailed clearing algorithms for the day-ahead market, intra-day continuous trading, redispatch, and imbalances. Moreover, ASAM includes numerous policy performance indicators, including a novel price mark-up indicator and novel redispatch performance indicators. A stylized simulation scenario verified and validated the model and addressed a redispatch design question. The results displayed the following implications from order types in redispatch markets with multi-period all-or-none design: (1) The order design provides few risks for market parties, as orders are fully cleared. (2) Large orders may lead to dispatch ramps before and after the delivery period and may cause ramp-risk mark-ups as well as additional trading of imbalances on intra-day. (3) All-or-none design in a liquid situation leads to the over-procurement of redispatch by the grid operator, as orders cannot be partially activated. Moreover, it is likely that the grid operator induces imbalances to the system by incomplete redispatch activation (i.e. upward and downward redispatch volumes are not equal).

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑