Electric grid faults can cause catastrophic wildfires, particularly in regions with high winds and low humidity. In real-time operations, electric utilities are often left with few options for wildfire risk mitigation, leading to use of disruptive measures such as proactive de-energization of equipment, frequently referred to as public safety power shut-offs. Such power shut-offs have significant impacts on customers, who experience power cuts in an attempt to protect them from fires. This work proposes the optimal power shut-off problem, an optimization model to support short-term operational decision making in the context of extreme wildfire risk. Specifically, the model optimizes grid operations to maximize the amount of power that can be delivered, while proactively minimizing the risk of wildfire ignitions by selectively de-energizing components in the grid. This is the first optimization model to consider how preventive wildfire risk measures impact both wildfire risk \emph{and} power systems reliability at a short-term, operational time-frame. The effectiveness of the method is demonstrated on an augmented version of the RTS-GMLC test case, located in Southern California, and compared against two approaches based on simple risk thresholds. The proposed optimization-based model reduces both wildfire risk and lost load shed relative to the benchmarks.
Electric power infrastructure has ignited several of the most destructive wildfires in recent history. Preemptive power shutoffs are an effective tool to mitigate the risk of ignitions from power lines, but at the same time can cause widespread power outages. This work proposes a mathematical optimization problem to help utilities decide where and when to implement these shutoffs, as well as how to most efficiently restore power once the wildfire risk is lower. Specifically, our model co-optimizes the power shutoff (considering both wildfire risk reduction and power outages) as well as the pos…
Wildfires are a threat to public safety and have increased in both frequency and severity due to climate change. To mitigate wildfire ignition risks, electric power system operators proactively de-energize high-risk power lines during "public safety power shut-off" (PSPS) events. Line de-energizations can cause communities to lose power, which may result in negative economic, health, and safety impacts. Furthermore, the same communities may repeatedly experience power shutoffs over the course of a wildfire season, which compounds these negative impacts. However, there may be many combinations …
Wildfires pose a growing risk to public safety in regions like the western United States, and, historically, electric power systems have ignited some of the most destructive wildfires. To reduce wildfire ignition risks, power system operators preemptively de-energize high-risk power lines during extreme wildfire conditions as part of "Public Safety Power Shutoff" (PSPS) events. While capable of substantially reducing acute wildfire risks, PSPS events can also result in significant amounts of load shedding as the partially de-energized system may not be able to supply all customer demands. In t…
Utilities in California conduct Public Safety Power Shut-offs (PSPSs) to eliminate the elevated chances of wildfire ignitions caused by power lines during extreme weather conditions. We propose Wildfire Risk Aware operation planning Problem (WRAP), which enables system operators to pinpoint the segments of the network that should be de-energized. Sustained wind and wind gust can lead to conductor clashing, which could ignite surrounding vegetation. The 3D non-linear vibration equations of power lines are employed to generate a dataset that considers physical, structural, and meteorological par…
In an effort to reduce power system-caused wildfires, utilities carry out public safety power shutoffs (PSPS) in which portions of the grid are de-energized to mitigate the risk of ignition. The decision to call a PSPS must balance reducing ignition risks and the negative impact of service interruptions. In this work, we consider three PSPS scheduling scenarios, which we model as dynamic programs. In the first two scenarios, we assume that N PSPSs are budgeted as part of the investment strategy. In the first scenario, a penalty is incurred for each PSPS declared past the Nth event. In the seco…