野火灾害风险地区电网扩展规划的困境

The Dilemma of Electricity Grid Expansion Planning in Areas at the Risk of Wildfire

Muhammad Waseem, Reza Bayani, Saeed D. Manshadi

AI总结:

针对野火风险下的电网规划难题,本文构建含分布式光伏、线路改造与新增的两阶段鲁棒优化模型,并用C&CG算法在6及118节点系统验证其平衡安全停电与供电成本的效果。

摘要:

公用事业公司认为,为缓解野火风险,公共安全停电是必要措施。本文提出了火灾危险天气条件下的电力系统扩展规划。根据起火风险对输电线路进行量化。文中讨论了一个为期10年的扩展规划情景,通过考虑三个决策变量为客户供电:分布式太阳能发电、现有电力线路改造以及新增线路。构建了两阶段鲁棒优化问题,并采用Column-and-Constraint Generation Algorithm(列与约束生成算法)求解,以在客户停电、分布式太阳能发电、电力线路改造和新增线路之间取得更优平衡。该规划涉及对高野火风险区域的线路实施停电,并通过整合分布式太阳能发电为客户供电。文中评估了线路停电对分布式太阳能发电的影响,统计了10年期间每条线路的通电小时数和总负荷削减量。同时考虑了系统需求和太阳能整合的不同不确定性水平,以考察其对系统总运行成本的影响。所提算法的有效性在6节点和118节点系统上进行了评估。

英文摘要:

The utilities consider public safety power shut-offs imperative for the mitigation of wildfire risk. This paper presents expansion planning of power system under fire hazard weather conditions. The power lines are quantified based on the risk of fire ignition. A 10-year expansion planning scenario is discussed to supply power to customers by considering three decision variables: distributed solar generation; modification of existing power lines; addition of new lines. Two-stage robust optimization problem is formulated and solved using Column-and-Constraint Generation Algorithm to find improved balance among de-energization of customers, distributed solar generation, modification of power lines, and addition of new lines. It involves lines de-energization of high wildfire risk regions and serving the customers by integrating distributed solar generation. The impact of de-energization of lines on distributed solar generation is assessed. The number of hours each line is energized and total load shedding during a 10-year period is evaluated. Different uncertainty levels for system demand and solar energy integration are considered to find the impact on the total operation cost of the system. The effectiveness of the presented algorithm is evaluated on 6- and 118-bus systems.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑