长时电池在野火风险下的容量配置、选址与运行:基于渐进对偶的求解方法

Long Duration Battery Sizing, Siting, and Operation Under Wildfire Risk Using Progressive Hedging

Ryan Piansky, Georgia Stinchfield, Alyssa Kody, Daniel K. Molzahn, Jean-Paul Watson

AI总结:

针对野火风险下的长时电池容量配置、选址与运行问题,提出基于渐进对偶的定制时间分解方法,在240节点WECC模型上70分钟内求解全年小时级运行决策。

摘要:

电池容量配置与选址问题因需兼顾短期运行决策而具有很高的计算挑战性。本文研究在电网中配置、选址并运行电池以最大化其效益,包括正常运营及野火高发风险期间的电价套利与减载缓解。我们构建了一个多场景优化问题,用于长时电池储能,同时考虑在公共安全断电(PSPS)事件中可能发生的负荷削减,此类事件通过切断线路供电以降低严重野火引燃风险。为在包含大量野火风险及功率注入波动场景的情况下实现计算可扩展的求解,我们基于渐进对偶框架开发了一种定制的时间分解方法。在传统渐进对偶技术基础上,我们同时考虑了所有场景中选址变量的耦合以及时间边界处荷电状态变量的耦合。这确保了跨场景的一致性,并允许在空间与时间耦合并存的情况下进行并行计算。所提出的分解方法能够高效且可扩展地建模一整年的小时级运行决策,从而为电池的容量配置与选址提供依据。利用该分解方法,我们针对一个240节点WECC模型,在不到70分钟的墙钟时间内完成了一整年小时级运行决策的建模,以确定最优电池布置。

英文摘要:

Battery sizing and siting problems are computationally challenging due to the need to make long-term planning decisions that are cognizant of short-term operational decisions. This paper considers sizing, siting, and operating batteries in a power grid to maximize their benefits, including price arbitrage and load shed mitigation, during both normal operations and periods with high wildfire ignition risk. We formulate a multi-scenario optimization problem for long duration battery storage while considering the possibility of load shedding during Public Safety Power Shutoff (PSPS) events that de-energize lines to mitigate severe wildfire ignition risk. To enable a computationally scalable solution of this problem with many scenarios of wildfire risk and power injection variability, we develop a customized temporal decomposition method based on a progressive hedging framework. Extending traditional progressive hedging techniques, we consider coupling in both placement variables across all scenarios and state-of-charge variables at temporal boundaries. This enforces consistency across scenarios while enabling parallel computations despite both spatial and temporal coupling. The proposed decomposition facilitates efficient and scalable modeling of a full year of hourly operational decisions to inform the sizing and siting of batteries. With this decomposition, we model a year of hourly operational decisions to inform optimal battery placement for a 240-bus WECC model in under 70 minutes of wall-clock time.