摘要:
广泛存在的不确定性使得风电与电网之间的相互作用更加复杂,难以建模和处理。针对风电机组组合问题中存在的多种不确定性,提出了一种基于概率、可能性和区间测度的求解方法。为了全面有效地处理多种不确定性,应用证据理论将这些不确定变量融合成Dempster-Shafer结构。此外,功率损耗被引入到功率平衡约束,并采用扩展仿射算法(EAA)来评估由上述不确定性的传播所造成的功率损耗的不确定性。针对所建立的优化模型的混合离散非线性特性,提出了一种改进的灰狼优化算法(GWO)来求解该模型。具体地说,相应的承诺计划是由一种二进制灰狼优化器(BGWO)确定的,经济调度(ED)由GWO解决。最后,IEEE 30节点测试系统和中国电力系统的实际规模的183节点系统的研究证明了所提出的模型和方法的有效性和可扩展性。
英文摘要:
The widespread uncertainties have made the interaction between wind power and power grid more complicated and difficult to model and handle. This paper proposes an approach for the solution of unit commitment (UC) problem incorporating multiple uncertainties that exist in both wind power and power grid inherently, consisting of probability, possibility, and interval measures. To handle the manifold uncertainties in a comprehensive and efficient manner, the evidence theory (ET) is applied to fuse these uncertain variables into Dempster-Shafer structure. Moreover, the power loss is introduced into power balance constraints, and the extended affine arithmetic (EAA) is employed to evaluate the uncertainty of power loss caused by the propagation of the aforementioned uncertainties. Regarding the mix-discrete nonlinear characteristics of the established optimization model, an enhanced grey wolf optimizer (GWO) algorithm is developed to solve the proposed model. Specifically, the corresponding commitment schedule is determined by a kind of binary grey wolf optimizer (BGWO), and the economic dispatch (ED) is settled by GWO. Finally, the IEEE 30-bus test system and a real-sized 183-bus China power system are studied to demonstrate the validity and scalability of the proposed model and method.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。