This work deals with the problem of estimating a photovoltaic generation forecasting model in scenarios where measurements of meteorological variables (i.e. solar irradiance and temperature) at the plant site are not available. A novel algorithm for the estimation of the parameters of the well-known PVUSA model of a photovoltaic plant is proposed. Such a method is characterized by a low computational complexity, and efficiently exploits only power generation measurements, a theoretical clear-sky irradiance model, and temperature forecasts provided by a meteorological service. An extensive experimental validation of the proposed method on real data is also presented.
Ultra-Short-Term Photovoltaic Ramp Forecasting via Physics-Guided Generative Sky Video Prediction
Cornell University(康奈尔大学);AI for Science Institute and Cornell AI for Sustainability Initiative (CAISI), Cornell University(康奈尔大学人工智能科学研究所与康奈尔人工智能可持续发展倡议)
Real Time State Estimation of Power Grids Using Convolutional Neural Networks and State Forecasting Via Recurrent Neural Networks
电网在向家庭、工业和其他需要电能的地方输送电能方面发挥着非常重要的作用。由于需求的增加,电网面临着电压变化的巨大挑战。这是由于各种能源消耗设备和电器的使用,如电动汽车,工业消费,能源需求的偶尔高峰等,对于这些需求的波动,监控电网运行的条件变得非常重要。一旦知道这些条件,就可以操纵能源生产来满足需求。现有的电力系统状态估计(PSSE)技术在产生最优性能方面可能并不好。此外,它们在计算处理方面也是昂贵的。为了解决这个问题,本研究提出了一种基于卷积神经网络(CNN)的电网状态估计方法。结果发现,该模型产生的RMSE为2.57 x 10-4,这比使用Prox线性模型(2.97 x 10-4)进行估计所涉及的先前研究之一相对准确。此外,研究还提出了电力系统状态预测,以提高系统的意识和弹性。预测采用递归神经网络(RNN)模型。该模型有助于解释数据中存在的长期非线性方面,并在此基础上进行预测。所提出的模型预测的RMSE为2.53 x 10-3,与上述先前的研究(2.59 x 10-3)相当。