arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1707.01596math.OCcs.SYeess.SYstat.ML
收藏

大规模电力网络拓扑估计:关于精确恢复的保证

Topology Estimation in Bulk Power Grids: Guarantees on Exact Recovery

Los Alamos National Laboratory(洛斯阿拉莫斯国家实验室);University of Minnesota Twin Cities(明尼苏达大学双城分校)

Deepjyoti Deka, Saurav Talukdar, Michael Chertkov, Murti Salapaka

AI总结:

本文提出了一种基于电压测量的图模型框架,用于估计大规模电力网络拓扑,通过阈值或邻域计数方案提取操作边,并在无三节点环的电网中保证精确恢复。

摘要:

电力网络拓扑影响其动态运行和电力市场结算。实时拓扑识别可使在故障等紧急场景下更快采取控制措施。本文讨论了一种图模型框架,用于利用电网节点收集的电压测量值估计大规模电力网络(包括环形输电和辐射分布)的拓扑。图模型的概率分布节点电压在线性功率流模型中包含额外边以及真实电网的操作边。所提出的估计算法首先学习图模型,随后使用阈值或邻域计数方案提取操作边。对于无三节点环(两个母线不共享公共邻居)的电网拓扑,证明了精确提取操作拓扑的理论保证。这包括大多数具有辐射拓扑的配电网络。对于包含三节点环的电网,提供确保存在精确重建算法的充分条件。特别是对于单位长度恒定阻抗和均匀注入协方差的电网,这一观察导致对母线地理位置的条件。算法性能在测试案例模拟中得到验证。

英文摘要:

The topology of a power grid affects its dynamic operation and settlement in the electricity market. Real-time topology identification can enable faster control action following an emergency scenario like failure of a line. This article discusses a graphical model framework for topology estimation in bulk power grids (both loopy transmission and radial distribution) using measurements of voltage collected from the grid nodes. The graphical model for the probability distribution of nodal voltages in linear power flow models is shown to include additional edges along with the operational edges in the true grid. Our proposed estimation algorithms first learn the graphical model and subsequently extract the operational edges using either thresholding or a neighborhood counting scheme. For grid topologies containing no three-node cycles (two buses do not share a common neighbor), we prove that an exact extraction of the operational topology is theoretically guaranteed. This includes a majority of distribution grids that have radial topologies. For grids that include cycles of length three, we provide sufficient conditions that ensure existence of algorithms for exact reconstruction. In particular, for grids with constant impedance per unit length and uniform injection covariances, this observation leads to conditions on geographical placement of the buses. The performance of algorithms is demonstrated in test case simulations.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑