费米实验室回收环到P1线的束流引出

Beam Extraction From The Recycler Ring To P1 Line At Fermilab

M. Xiao, D. Capista, P. Adams, D. Morris, M. J. Yang, K. Hazewood

摘要:

从回收环到P1线的束流提取传输线提供了一种方法,可以使用现有的束流传输线,通过回收环将8 GeV的动能质子从助推器输送到输送环,而不需要新的民用建筑。它是在2012年设计的。RR中RR 520处的冲击磁铁和RR 522处的lambertson磁铁于2014年夏季安装,RR至P1 Stub的元件(永久四边形、调整四边形、校正器、BPM、703处的环形线圈和V703处的垂直弯曲偶极子(ADCW))于2015年夏季安装。2016年6月21日(星期二),从Recycler Ring到P1线的梁线调试。详细结果将在本报告中介绍。

英文摘要:

The transfer line for beam extraction from the Recycler ring to P1 line provides a way to deliver 8 GeV kinetic energy protons from the Booster to the Delivery ring, via the Recycler, using existing beam transport lines, and without the need for new civil construction. It was designed in 2012. The kicker magnets at RR520 and the lambertson magnet at RR522 in the RR were installed in 2014 Summer Shutdown, the elements of RR to P1 Stub (permanent quads, trim quads, correctors, BPMs, the toroid at 703 and vertical bending dipole at V703 (ADCW) were installed in 2015 Summer Shutdown. On Tuesday, June 21, 2016, beam line from the Recycler Ring to P1 line was commissioned. The detailed results will be presented in this report.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑