旅行修理工和其他最小等待时间问题的多项式时间近似方案
Polynomial time approximation schemes for the traveling repairman and other minimum latency problems
摘要:
给出了欧氏平面上和加权树上的旅行修理工问题的一个多项式时间的$(1+ε)$ -近似算法。这改进了已知的拟多项式时间近似计划为这些问题。该算法是基于一个简单的技术,减少TRP我们称之为\emph{segmented TSP}。在这里,我们给出了数字$l_1,\dots,l_K$和$n_1,\dots,n_K$,并且我们需要找到一条路径,该路径至少访问所有$h\in\{1,\dots,K\}$的从起点起的路径距离$l_h$内的$n_h$点。如果在距离$αl_h$内至少访问了$n_h$点,则解决方案是$α$ -近似的。证明了在某个度量空间中对\emph{every constant} $K$是$α$ -逼近的算法,在同一度量空间中对TRP也是$α(1+ε)$ -逼近.随后,近似计划给出了这个分段TSP问题在平面上和加权树。只有一段的分段TSP($K=1$)等价于$k$ -TSP,其中对于一般度量空间已知$(2+ε)$ -近似。因此,这种方法通过分段TSP提供了新的冲动,改进的3.59近似TRP在一般的度量空间。类似的减少适用于许多其他最小延迟问题。为了说明这种方法的强度,我们将其应用到调度问题的优先约束下,$1|prec|\sum w_{j}C_{j}$,最小化总加权完成时间,并提出了一个多项式时间近似计划的情况下,间隔顺序优先约束。这改进了已知的$3/2$ -近似这个问题。如果将发布日期添加到问题中,这两种近似方案也适用。
英文摘要:
We give a polynomial time, $(1+ε)$-approximation algorithm for the traveling repairman problem (TRP) in the Euclidean plane and on weighted trees. This improves on the known quasi-polynomial time approximation schemes for these problems. The algorithm is based on a simple technique that reduces the TRP to what we call the \emph{segmented TSP}. Here, we are given numbers $l_1,\dots,l_K$ and $n_1,\dots,n_K$ and we need to find a path that visits at least $n_h$ points within path distance $l_h$ from the starting point for all $h\in\{1,\dots,K\}$. A solution is $α$-approximate if at least $n_h$ points are visited within distance $αl_h$. It is shown that any algorithm that is $α$-approximate for \emph{every constant} $K$ in some metric space, gives an $α(1+ε)$-approximation for the TRP in the same metric space. Subsequently, approximation schemes are given for this segmented TSP problem in the plane and on weighted trees. The segmented TSP with only one segment ($K=1$) is equivalent to the $k$-TSP for which a $(2+ε)$-approximation is known for a general metric space. Hence, this approach through the segmented TSP gives new impulse for improving on the 3.59-approximation for TRP in a general metric space. A similar reduction applies to many other minimum latency problems. To illustrate the strength of this approach we apply it to the well-studied scheduling problem of minimizing total weighted completion time under precedence constraints, $1|prec|\sum w_{j}C_{j}$, and present a polynomial time approximation scheme for the case of interval order precedence constraints. This improves on the known $3/2$-approximation for this problem. Both approximation schemes apply as well if release dates are added to the problem.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。