High engineering critical current density JE of >500 A/mm2 at 20 T and 4.2 K can be regularly achieved in Ag-sheathed multifilamentary Bi2Sr2CaCu2Ox (Bi-2212) round wire when the sample length is several centimeters. However, JE(20 T) in Bi-2212 wires of several meters length, as well as longer pieces wound in coils, rarely exceeds 200 A/mm2. Moreover, long-length wires often exhibit signs of Bi-2212 leakage after melt processing that are rarely found in short, open-end samples. We studied the length dependence of JE of state-of-the-art powder-in-tube (PIT) Bi-2212 wires and gases released by them during melt processing using mass spectroscopy, confirming that JE degradation with length is due to wire swelling produced by high internal gas pressures at elevated temperatures [1,2]. We further modeled the gas transport in Bi-2212 wires and examined the wire expansion at critical stages of the melt processing of as-drawn PIT wires and the wires that received a degassing treatment or a cold-densification treatment before melt processing. These investigations showed that internal gas pressure in long-length wires drives creep of the Ag sheath during the heat treatment, causing wire to expand, lowering the density of Bi-2212 filaments, and therefore degrading the wire JE; the creep rupture of silver sheath naturally leads to the leakage of Bi-2212 liquid. Our work shows that proper control of such creep is the key to preventing Bi-2212 leakage and achieving high JE in long-length Bi-2212 conductors and coils.
Evidence for length-dependent wire expansion, filament dedensification and consequent degradation of critical current density in Ag-alloy sheathed Bi-2212 wires
Cost Projections for High Temperature Superconductors
通常认为,为了使高温超导体(HTS)在电力应用中具有成本竞争力,对于在77 K下的操作,导线将必须以大约$10 per kiloampere meter ($ 10/kAm的价格出售(例如,NbTi的成本约为$1/kAm and Nb3Sn around $ 8,每个为4.2 K)。考虑到已经知道的关于Pb稳定的Bi-2223(BSCCO)的临界电流性能,对于通过氧化物粉末管(OPIT)技术生产的银护套BSCCO,该成本目标可能极难实际实现。在本文中,我们研究了组件材料的成本,增加了劳动力和相关成本的合理估计,并得出了可能的成本/性能(C/P)数字。我们还估计了一个工厂的资本成本,以生产高温超导导体的特定涂层导体的方法,并计算必要的生产,输出和性能参数所需的制造10公里/年的电线和其相关的C/P。我们的结果表明,客户看到的实际C/P将在未来一段时间内保持在这个10美元/kAm的目标。
Large enhancement of transport critical current density of ex-situ PIT Ag/(Ba,K)Fe2As2 tapes achieved by applying cycles of cold deformation and heat treatment