The emergence of the ISR project at CERN is described in the light of the situation at CERN at the end of the 1950s when the CERN Proton Synchrotron (PS) was still under construction. The discussions leading to the project are put into context with world-wide efforts to build larger and more powerful accelerators at that time; the evolution of the project before approval is sketched. The basic design considerations and the most significant technological choices are explained. The construction period is summarized by highlighting important milestones and the performance achieved during commissioning in 1971, the first year of running, is given.
X-ray reflection: a FLUKA model and its application in the design of synchrotron light beamlines and CERN's Future Circular Collider
European Organization for Nuclear Research(欧洲核子研究组织);Facultat de Física, Universitat de Barcelona(巴塞罗那大学物理学院);Argonne National Laboratory(阿贡国家实验室);University of Liverpool(利物浦大学);ALBA Synchrotron(阿尔巴同步辐射中心);European Synchrotron Radiation Facility(欧洲同步辐射装置);Reflective X-ray Optics LLC(反射X射线光学有限责任公司)
Design development and implementation of an irradiation station at the neutron time-of-flight facility at CERN
一个新的寄生式、混合场、中子为主的辐照站最近已在欧洲粒子物理实验室(CERN)投入使用。该站安装在中子飞行时间设施中,利用中子散射靶产生的二次辐射。新的台站允许在更接近于粒子加速器运行期间所遇到的辐照条件下进行辐射损害研究;在台站进行的辐照试验将补充通常用伽马源进行的材料标准试验。样品将每年暴露于MGy范围内的中子剂量,对n TOF设施运行的影响最小。该工作站有24个辐照位置,每个位置可容纳多达100 cm 3的样品材料。鉴于其接近nTOF靶,在保护屏蔽内,考虑到人员的安全并避免对nTOF设施和实验的操作产生任何不必要的影响,已经仔细地开发了辐照站及其操作程序。由于nTOF靶周围的整个区域和辐照样品的残留放射性,即使当nTOF设施不运行时,也禁止人类操作员进入辐照站。机器人用于远程安装和取回样品,并根据辐射防护条例和最大限度地减少人员剂量的目的,对处理程序进行了其他优化。