超密集网络中基于负载共享的基站睡眠策略
Base Station Sleeping Strategy Based on Load Sharing in Ultra-Dense Networks
AI总结:
本文提出了一种基于负载共享的基站睡眠策略,通过优化初始连接和负载管理,提升超密集网络的能效与服务质量。
摘要:
为了解决5G超密集网络(UDNs)中密集部署小型基站(s-BSs)导致的高运营成本和低能效(EE)问题,本文首先构建了一个多目标数学优化模型,旨在最大化能效并最小化活跃基站的数量。该模型纳入了基站运行状态、用户设备(UE)-基站连接关系和负载阈值等关键约束,为节能与服务质量的协调优化奠定了理论基础。基于该模型,提出了一种结合UE-BS初始连接优化和基于负载共享的基站睡眠的综合解决方案。在初始连接阶段,通过通信质量和基站负载作为双重约束,通过三个连续步骤实现UE与最优基站的高效匹配:通信可行性筛选、冗余连接去除和过载负载再分配。这解决了由于初始连接无序导致的负载不平衡和冗余基站难以识别问题。在基站睡眠阶段,引入了一个综合考虑UE可转移性和备用基站资源的基站睡眠指数,创新性地用于量化基站睡眠优先级。通过涉及低负载基站筛选、相邻基站负载评估以及基于容量的两个接管基站负载共享的闭环过程,实现了冗余基站的精确睡眠和协同负载迁移。在典型UDN场景中的仿真结果表明,与传统基线方案相比,所提方案在收敛速度、活跃基站数量优化和能效提升方面具有显著优势。
英文摘要:
To address the issues of high operational costs and low energy efficiency (EE) caused by the dense deployment of small base stations (s-BSs) in 5G ultra-dense networks (UDNs), this paper first constructs a multi-objective mathematical optimization model targeting maximizing EE and minimizing the number of active BSs. The model incorporates key constraints including BS operational state, user equipment (UE)-BS connection relationship, and load threshold, laying a theoretical foundation for the coordinated optimization of energy conservation and quality of service. Based on this model, an integrated solution combining UE-BS initial connection optimization and load-sharing based BS sleeping is proposed. In the initial connection phase, with communication quality and BS load as dual constraints, efficient matching between UEs and optimal BSs is achieved through three sequential steps: communication feasibility screening, redundant connection removal, and overload load redistribution. This resolves the problems of load imbalance and difficult identification of redundant BSs in UDNs arising from unordered initial connections. In the BS sleeping phase, a BS sleeping index, comprehensively considering UE transferability and backup BS resources, is innovatively introduced to quantify BS dormancy priority. Through a closed-loop process involving low-load BS screening, adjacent BS load evaluation, and load sharing by two takeover BSs based on their capacity, accurate dormancy of redundant BSs and collaborative load migration are realized. Simulation results in a typical UDNs scenario demonstrate that, compared with the traditional baseline scheme, the proposed solution exhibits significant advantages in convergence speed, optimization of the number of active BSs, and EE improvement.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。