使用可扩展云技术的配电系统风险感知规划

Risk-Aware Planning of Power Distribution Systems Using Scalable Cloud Technologies

Shiva Poudel, Poorva Sharma, Abhineet Parchure, Daniel Olsen, Sayantan Bhowmik, Tonya Martin, Dylan Locsin, Andrew P. Reiman

AI总结:

针对EV与PV接入带来的复合不确定性,本文提出基于Markov模型、Monte Carlo模拟和模块化云架构的可扩展随机配电规划应用,并在IEEE 123节点系统上高效完成大规模年度潮流情景分析。

摘要:

配电网规划中的不确定性源于电动汽车(EV)和太阳能光伏(PV)系统采用过程中不可预测的时空模式。这种复杂性来自EV、PV系统、用户行为和天气条件之间的相互作用,因此需要一个可扩展框架来捕捉全部可能情景,并分析电网响应,以计入复合不确定性。尽管这一过程如今对许多公用事业公司而言具有挑战性,但将众多电网参数建模为随机变量,并从许多不同视角评估其对系统的影响,对于促进更具战略性、信息更充分的规划投资将变得日益必要。我们提出了一个可扩展、具备随机意识的配电系统规划应用,通过Markov模型捕捉时空变化,并利用模块化的基于云的架构开展Monte Carlo模拟,以应对这些不确定性。结果表明,由Markov模型生成的15,000个潮流情景在修改后的IEEE 123节点测试馈线上完成,每个模拟代表一次8,760小时的时间序列运行,全部在一小时内完成。从这一海量模拟数据中提取的电网影响,为所采用技术的时空效应提供了洞见,并强调:仅针对平均条件进行规划是不充分的,而最坏情景规划则可能导致难以承受的费用。

英文摘要:

The uncertainty in distribution grid planning is driven by the unpredictable spatial and temporal patterns in adopting electric vehicles (EVs) and solar photovoltaic (PV) systems. This complexity, stemming from interactions among EVs, PV systems, customer behavior, and weather conditions, calls for a scalable framework to capture a full range of possible scenarios and analyze grid responses to factor in compound uncertainty. Although this process is challenging for many utilities today, the need to model numerous grid parameters as random variables and evaluate the impact on the system from many different perspectives will become increasingly essential to facilitate more strategic and well-informed planning investments. We present a scalable, stochastic-aware distribution system planning application that addresses these uncertainties by capturing spatial and temporal variability through a Markov model and conducting Monte Carlo simulations leveraging modular cloud-based architecture. The results demonstrate that 15,000 power flow scenarios generated from the Markov model are completed on the modified IEEE 123-bus test feeder, with each simulation representing an 8,760-hour time series run, all in under an hour. The grid impact extracted from this huge volume of simulated data provides insights into the spatial and temporal effects of adopted technology, highlighting that planning solely for average conditions is inadequate, while worst-case scenario planning may lead to prohibitive expenses.