arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1712.08111astro-ph.IMcs.SYeess.SY
收藏

用自动化规划技术提高NASA Swift的科学产出

Improving science yield for NASA Swift with automated planning technologies

Department of Astronomy and Astrophysics, The Pennsylvania State University(宾夕法尼亚大学天文学与天体物理系)

Aaron Tohuvavohu

AI总结:

本文探讨了通过自动化规划技术提升Swift任务科学产出的研究,核心方法包括将调度问题建模为动态模糊约束满足问题,并利用经典优化、算法技术和机器学习方法来超越人类调度质量。

摘要:

Swift伽马射线暴探测器是一项独特的能力任务,拥有三个 onboard 仪器和快速 slewing 能力。它为从引力波伴随后续搜索到彗星科学的一切提供快速响应卫星观测站。Swift每天平均进行125次不同的观测,且持续超负荷,每月回应约100个机会目标(ToO)请求,同时与许多其他天文台有共指向和后续协议。自2004年发射以来,对航天器的需求在数量和类型以及日程复杂性方面持续增长。为了促进这种增长,Swift团队已构建了各种调度工具和辅助技术,以继续提高Swift任务的科学产出。然而,这些工具仅用于帮助人类探索局部帕累托表面和修复约束违反。由于调度任务的计算复杂性,没有自动化工具能够产生与受过良好训练的人类产生的同等或更高质量的计划,给定必要的时间限制。在本报告中,我们正式将Swift调度问题建模为动态模糊约束满足问题(DF-CSP),并探索全局解空间。我们在这里详细介绍了几种实现超越人类质量调度目标的方法,包括经典优化和算法技术,以及机器学习和循环神经网络(RNN)方法。然后我们简要讨论了进一步发展和采用这些技术所带来的增加的科学产出和对更广泛天体物理学社区的好处。

英文摘要:

The Swift Gamma-Ray Burst Explorer is a uniquely capable mission, with three on-board instruments and rapid slewing capabilities. It serves as a fast-response satellite observatory for everything from gravitational-wave counterpart searches to cometary science. Swift averages 125 different observations per day, and is consistently over-subscribed, responding to about one-hundred Target of Oportunity (ToO) requests per month from the general astrophysics community, as well as co-pointing and follow-up agreements with many other observatories. Since launch in 2004, the demands put on the spacecraft have grown consistently in terms of number and type of targets as well as schedule complexity. To facilitate this growth, various scheduling tools and helper technologies have been built by the Swift team to continue improving the scientific yield of the Swift mission. However, these tools have been used only to assist humans in exploring the local pareto surface and for fixing constraint violations. Because of the computational complexity of the scheduling task, no automation tool has been able to produce a plan of equal or higher quality than that produced by a well-trained human, given the necessary time constraints. In this proceeding we formalize the Swift Scheduling Problem as a dynamic fuzzy Constraint Satisfaction Problem (DF-CSP) and explore the global solution space. We detail here several approaches towards achieving the goal of surpassing human quality schedules using classical optimization and algorithmic techniques, as well as machine learning and recurrent neural network (RNN) methods. We then briefly discuss the increased scientific yield and benefit to the wider astrophysics community that would result from the further development and adoption of these technologies.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑