针对集中式发电爬坡速率限制导致停电后负荷恢复延迟的问题,提出一体化输电与配电协调模型,利用配电系统中的DERs配合有限集中式发电加速负荷恢复,并在IEEE测试案例中验证了其有效性。

摘要:

配电系统正以智能电网的形式演进。分布式能源(DERs)的激增使得此前被动的系统变得活跃且更为复杂。随着去碳化原则的采用,大型煤电和核电站正逐渐被可再生能源和无碳DERs所取代。伴随这一快速转型,电力系统以更低的惯性和极小的裕度运行。近年来,电力系统更频繁地面临极端天气事件,大规模停电已成常态。在完全或部分停电后,电力系统在恢复到正常运行状态前会经历不同阶段。负荷恢复是停电后电力系统全面重建的阶段;然而,由于集中式发电有限的爬坡速率,大量负荷的通电会被延迟一段时间。为减轻集中式发电爬坡速率的负面影响,提出利用配电系统中的DERs,与输电系统中有限的集中式发电相协调,为输电和配电系统中的负荷供电。该问题被构建为集中式或一体化输电与配电(T&D)协调模型。采用修改后的IEEE 14节点测试案例和IEEE 13节点测试馈线来验证所提策略;结果表明了所提模型的有效性。

英文摘要:

The power distribution system is evolving in the form of an intelligent grid. The proliferation of distributed energy resources (DERs) makes the previously passive system active and more complicated. With the adoption of de-carbonization principles, large-scale coal and nuclear power plants are being gradually replaced by renewables and carbon-free DERs. With this rapid transformation, the power system operates with less inertia and minimal margins. In recent years, power systems have been facing apocalyptic weather events more frequently, and large-scale blackouts have become regular. After the complete or partial blackouts, the power system goes through different stages before it reaches the normal operating condition. The load restoration is the stage where the power system is fully established after the blackouts; however, due to the limiting ramping rates of centralized generation, the energization of large amounts of loads is delayed by some time. To mitigate the negative impact of ramping rates of centralized generation, DERs in distribution systems are proposed to serve the loads in both transmission and distribution systems in coordination with limited centralized generation in the transmission system. The problem is formulated as a centralized or integrated transmission and distribution (T$\&$D) coordination model. The modified IEEE 14 bus test case and IEEE 13 node test feeders are used to validate the proposed strategy; the results indicate the validity of the proposed model.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑