Resource-constrained project scheduling problems (RCPSP) are at the heart of many production planning problems across a plethora of applications. Although the problem has been studied since the early 1960s, most developments and test instances are limited to problems with less than 300 jobs, far from the thousands present in real-life scenarios. Furthermore, the RCPSP with discounted cost (DC) is critical in many of these settings, which require decision makers to evaluate the net present value of the finished tasks, but the non-linear cost function makes the problem harder to solve or analyze.
In this work, we propose a novel approximation algorithm for the RCPSP-DC. Our main contribution is that, through the use of geometrically increasing intervals, we can construct an approximation algorithm, keeping track of precedence constraints, usage of multiple resources, and time requirements. To our knowledge, this is the first approximation algorithm for this problem. Finally, through experimental analysis over real instances, we report the empirical performance of our approach, showing that our technique allows us to solve sizeable underground mining problems within reasonable time frames and gaps much smaller than the theoretically computed ones.
An optimization model for renewal scheduling and traffic flow routing
本文件是研究项目SATT(Samplanering av trafikpåverkande <$tgärder och trafikflöden,modellstudie /临时容量限制和交通流量的协调规划,模型研究)的第三个子报告。该报告总结了所考虑的建模替代方案。模型研究的主要结果是,我们提出了一个双层的方法来处理问题的两个部分,即更新项目的调度和随后的铁路交通流量的调整。这些贡献是:(1)用于调度项目任务的混合整数公式,以及(2)用于在这些项目任务的所施加的容量限制期间建立铁路交通的可能量的网络流公式。该模型的预期用途是用于特定生产年度的经济规划,该规划在生产过程开始之前进行。本文介绍了这个问题,并给出了(1)的完整描述,以及使用该模型进行的计算实验的结果。随附的报告给出了(2)的最终制剂的详细信息。
A Bi-Objective Mathematical Model for the Multi-Skilled Resource-Constrained Project Scheduling Problem Considering Reliability: An AUGMECON2VIKOR Hybrid Method