arXivDaily arXiv每日学术速递 周一至周五更新
arXiv周末暂无论文更新,休息一下吧,周末愉快~~
arXiv 2204.06097cs.LGcs.CE
收藏

基于机器学习代理模型的边坡稳定性预测

Slope stability predictions on spatially variable random fields using machine learning surrogate models

Royal Melbourne Institute of Technology (RMIT)(皇家墨尔本理工大学);University of Guilan(吉兰大学)

Mohammad Aminpour, Reza Alaie, Navid Kardani, Sara Moridpour, Majidreza Nazem

摘要:

随机场蒙特卡罗(MC)可靠性分析是一种确定失效概率的稳健随机方法。然而,这种方法,需要大量的数值模拟,要求高的计算成本。本文探讨了不同的机器学习(ML)算法作为代理模型训练有限数量的随机场边坡稳定性模拟预测结果的大数据集的效率。本文中的MC数据只需要检查失效或非失效,避免了耗时的安全系数计算。一个广泛的数据集,包括120,000有限差分MC边坡稳定性模拟,结合不同程度的土壤异质性和各向异性。在9种不同的模型和集成分类器中,Bagging Ensemble、随机森林和支持向量分类器是解决该问题的最佳模型。仅在0.47%的数据(500个样本)上进行训练,ML模型可以对整个120,000个样本进行分类,准确率为%85,AUC得分为%91。随着土体各向异性和非均匀性的增加,ML方法在随机场边坡稳定性分类中的性能普遍降低。ML辅助MC可靠性分析证明了一种稳健的随机方法,其中使用MC数据的%5预测失效概率的平均误差仅为%0.46。该方法将计算时间从306天减少到不到6小时。

英文摘要:

Random field Monte Carlo (MC) reliability analysis is a robust stochastic method to determine the probability of failure. This method, however, requires a large number of numerical simulations demanding high computational costs. This paper explores the efficiency of different machine learning (ML) algorithms used as surrogate models trained on a limited number of random field slope stability simulations in predicting the results of large datasets. The MC data in this paper require only the examination of failure or non-failure, circumventing the time-consuming calculation of factors of safety. An extensive dataset is generated, consisting of 120,000 finite difference MC slope stability simulations incorporating different levels of soil heterogeneity and anisotropy. The Bagging Ensemble, Random Forest and Support Vector classifiers are found to be the superior models for this problem amongst 9 different models and ensemble classifiers. Trained only on 0.47% of data (500 samples), the ML model can classify the entire 120,000 samples with an accuracy of %85 and AUC score of %91. The performance of ML methods in classifying the random field slope stability results generally reduces with higher anisotropy and heterogeneity of soil. The ML assisted MC reliability analysis proves a robust stochastic method where errors in the predicted probability of failure using %5 of MC data is only %0.46 in average. The approach reduced the computational time from 306 days to less than 6 hours.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑