脉冲直流系统击穿后的线性电压恢复
Linear voltage recovery after a breakdown in a pulsed dc system
摘要:
击穿可能发生在高电压应用中,即使在高真空条件下。以前,我们表明,重要的是要注意击穿后的电压恢复,以限制与主要的二次击穿的外观。这可以提高高压装置的整体效率。在这项研究中,我们专注于优化的线性击穿后电压恢复,与减轻二次击穿的问题的原则目标。我们研究电压恢复方案与不同的启动电压和斜率的线性电压增加,通过使用脉冲直流系统。我们发现,较高数量的脉冲在电压恢复过程中产生较少的二次BD和较低的整体击穿率。降低脉冲的数量导致更剧烈的电压恢复,从而导致更高的击穿率。更陡的电压增加速率导致在电压恢复期结束附近更局部化地发生二次击穿。还发现,峰值BD概率在斜坡周期结束后约1 s定期观察到,并且其值随着斜坡期间投入系统的能量的量呈指数下降。如果电压仅在电压恢复步骤之间增加,则该值也以(1.4 $\pm$ 0.3)ms的半衰期指数衰减。
英文摘要:
Breakdowns may occur in high-voltage applications even in ultrahigh vacuum conditions. Previously, we showed that it is important to pay attention to the post-breakdown voltage recovery in order to limit the appearance of secondary breakdowns associated with the primary ones. This can improve the overall efficiency of the high-voltage device. In this study, we focus on the optimization of the linear post-breakdown voltage recovery, with the principle aim of alleviating the problem of the secondary breakdowns. We investigate voltage recovery scenarios with different starting voltages and slopes of linear voltage increase by using a pulsed dc system. We find that a higher number of pulses during the voltage recovery produces fewer secondary BDs and a lower overall breakdown rate. Lowering the number of pulses led to more dramatic voltage recovery resulting in higher breakdown rates. A steeper voltage increase rate lead to a more localized occurrence of the secondary breakdowns near the end of the voltage recovery period. It was also found that the peak BD probability is regularly observed around 1 s after the end of the ramping period and that its value decreases exponentially with the amount of energy put into the system during the ramping. The value also decays exponentially with a half-life of (1.4$\pm$0.3) ms if the voltage only increased between the voltage recovery steps.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。