arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 2107.01613cs.DS
收藏

缩小单一资源约束调度的差距

Closing the gap for single resource constraint scheduling

Klaus Jansen, Malin Rau

摘要:

在单资源约束调度问题中,我们给定$m$相同的机器和一组工件,每个工件需要一台机器来处理,以及有限的可再生资源$R$的份额。如果在调度的每一点上,不超过此时正在处理的作业所需的机器和资源的数量,则这些作业的调度是可行的。用比$3/2$更好的比率来近似这个问题是NP难的。另一方面,迄今为止最好的算法具有$2+\varepsilon$的绝对近似比。本文提出了一种具有绝对逼近比的算法$(3/2+\varepsilon)$,它弥补了不可逼近性与最佳算法之间的差距,除了一个可忽略的小的$\varepsilon$。

英文摘要:

In the problem called single resource constraint scheduling, we are given $m$ identical machines and a set of jobs, each needing one machine to be processed as well as a share of a limited renewable resource $R$. A schedule of these jobs is feasible if, at each point in the schedule, the number of machines and resources required by jobs processed at this time is not exceeded. It is NP-hard to approximate this problem with a ratio better than $3/2$. On the other hand, the best algorithm so far has an absolute approximation ratio of $2+\varepsilon$. This paper presents an algorithm with absolute approximation ratio~$(3/2+\varepsilon)$, which closes the gap between inapproximability and best algorithm except for a negligible small~$\varepsilon$.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑