arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 2103.13054math.OC
收藏

多尺度多阶段随机规划的分布式算法及其在电力系统容量扩展中的应用

A Distributed Algorithm for Multi-scale Multi-stage Stochastic Programs with Application to Electricity Capacity Expansion

Run Chen, Andrew L. Liu

摘要:

将N块PCPM算法应用于多阶段多尺度随机规划问题,并将其应用于电力系统容量扩展模型。数值结果表明,与ADMM算法和PHA算法相比,本文提出的简化N块PCPM算法和混合分解方法在求解确定性大规模块可分最优化问题时具有更好的可扩展性.该算法的可扩展性的优越性归因于算法设计的两个关键特征:第一,所提出的扩展非预期约束的混合节点实现分解方法可以在不同时间尺度的各种不确定性下分解原问题;其次,当应用N块PCPM算法来解决由此产生的确定性大规模N块凸优化问题时,本文采用的正交投影技术大大简化了迭代步骤,减少了各计算单元之间的通信开销,提高了算法的效率。

英文摘要:

This paper applies the N-block PCPM algorithm to solve multi-scale multi-stage stochastic programs, with the application to electricity capacity expansion models. Numerical results show that the proposed simplified N-block PCPM algorithm, along with the hybrid decomposition method, exhibits much better scalability for solving the resulting deterministic, large-scale block-separable optimization problem when compared with the ADMM algorithm and the PHA algorithm. The superiority of the algorithm's scalability is attributed to the two key features of the algorithm design: first, the proposed hybrid scenario-node-realization decomposition method with extended nonanticipativity constraints can decompose the original problem under various uncertainties of different temporal scales; second, when applying the N-block PCPM algorithm to solve the resulting deterministic, large-scale N-block convex optimization problem, the technique of orthogonal projection we exploit greatly simplifies the iteration steps and reduce the communication overhead among all computing units, which also contributes to the efficiency of the algorithm.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑