arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2010.13624eess.SYcs.SY
收藏

风电输电系统集成--以中国风电基地为例

Wind Power Transmission System Integration -- a Case Study of China Wind Power Base

Jianxue Wang, Shutang You, Xingzhong Bai, Mingqiao Peng

摘要:

近年来,由于一系列扶持政策的出台,中国风电以规模化、集中化的模式快速发展。本文分析了中国风电发展面临的两大问题:风电可靠性和风能平衡。更具体地说,风电场跳闸脱网事件和弃风限电问题,造成巨大的经济损失,进行了详细的调查。根据大型风电基地的运行经验,提出了提高风电并网和电网可靠性的技术建议和经济激励措施。作为对我国风电发展的总结和展望,为其他国家未来风电发展提供参考。

英文摘要:

Due to a series of supporting policies in recent years, China wind power has developed rapidly through a large-scale and centralized mode. This paper analyzes the two major concerns faced by wind power development in China: wind generation reliability and wind energy balancing. More specifically, wind farm tripping-off-grid incidents and wind power curtailment issues, which caused huge economical loss, are investigated in details. Based on operation experience of large wind power bases, technical recommendations and economic incentives are proposed to improve wind power integration and power grid reliability. As a summary and outlook of wind power development in China, this paper provides a reference on future wind power development for other countries.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑