arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2001.10821cs.DS
收藏

加权有向图中的递减SSSP:更快且反对自适应Adjuster

Decremental SSSP in Weighted Digraphs: Faster and Against an Adaptive Adversary

Maximilian Probst Gutenberg, Christian Wulff-Nilsen

摘要:

给定一个经历边删除的动态有向图$G = (V,E)$,以及给定$s\in V$和$ε>0$,我们考虑在删除序列上保持从$s$到$G$中所有顶点的$(1+ε)$ -近似最短路距离的问题. Even and Shiloach(J.~ ACM的$81$)给出了一个确定性的数据结构,用于总更新时间$O(mn)$的问题的精确版本。Henzinger等人(STOC' $14$,ICALP' $15$)给出了具有改进的总更新时间$ O(mn^{0.9 + o(1)}\log W)$的近似版本的Monte Carlo数据结构,其中$W$是最大和最小边权重之间的比率。它们的数据结构的一个缺点是,它们只对一个不经意的对手起作用,这意味着删除的顺序需要提前修复。这限制了它作为算法内部黑盒的应用。我们提出了如下的$(1+ε)$ -近似数据结构:(1)第一种数据结构是Las Vegas,它对自适应攻击者有效,它的总期望更新时间为$\tilde O(m^{2/3}n^{4/3})$(对于未加权图)和$\tilde O(m^{3/4}n^{5/4}\log W)$(对于加权图),(2)第二种数据结构是Las Vegas,它假设一个不经意的攻击者;它对无权图有总期望更新时间$\tilde O(\sqrt m n^{3/2})$,对有权图有总期望更新时间$\tilde O(m^{2/3}n^{4/3}\log W)$;(3)第三种数据结构是Monte Carlo,在w. h. p.~对抗不经意的对手;它具有总的预期更新时间$\tilde O((mn)^{7/8}\log W) = \tilde O(mn^{3/4}\log W)$。我们的每个数据结构都可以在$G$的任何阶段以恒定的最坏情况时间进行查询;如果对手不注意,则可以扩展查询,以在与其长度成比例的时间内报告这样的路径。我们的更新时间比Henzinger等人的更快。对于所有的图形密度。

英文摘要:

Given a dynamic digraph $G = (V,E)$ undergoing edge deletions and given $s\in V$ and $ε>0$, we consider the problem of maintaining $(1+ε)$-approximate shortest path distances from $s$ to all vertices in $G$ over the sequence of deletions. Even and Shiloach (J.~ACM'$81$) give a deterministic data structure for the exact version of the problem with total update time $O(mn)$. Henzinger et al. (STOC'$14$, ICALP'$15$) give a Monte Carlo data structure for the approximate version with improved total update time $ O(mn^{0.9 + o(1)}\log W)$ where $W$ is the ratio between the largest and smallest edge weight. A drawback of their data structure is that they only work against an oblivious adversary, meaning that the sequence of deletions needs to be fixed in advance. This limits its application as a black box inside algorithms. We present the following $(1+ε)$-approximate data structures: (1) the first data structure is Las Vegas and works against an adaptive adversary; it has total expected update time $\tilde O(m^{2/3}n^{4/3})$ for unweighted graphs and $\tilde O(m^{3/4}n^{5/4}\log W)$ for weighted graphs, (2) the second data structure is Las Vegas and assumes an oblivious adversary; it has total expected update time $\tilde O(\sqrt m n^{3/2})$ for unweighted graphs and $\tilde O(m^{2/3}n^{4/3}\log W)$ for weighted graphs, (3) the third data structure is Monte Carlo and is correct w.h.p.~against an oblivious adversary; it has total expected update time $\tilde O((mn)^{7/8}\log W) = \tilde O(mn^{3/4}\log W)$. Each of our data structures can be queried at any stage of $G$ in constant worst-case time; if the adversary is oblivious, a query can be extended to also report such a path in time proportional to its length. Our update times are faster than those of Henzinger et al.~for all graph densities.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑