考虑短期约束的能量和备用联合optimization的最优发输电规划
Optimal Generation and Transmission Expansion Planning Addressing Short-Term Constraints with Co-optimization of Energy and Reserves
摘要:
可变可再生能源(VRE)在电力系统中的渗透改变了处理扩展规划的方式。这种资源在很短的时间内具有很大的可变性,这使得表示需要按时间顺序排列的小时约束变得非常重要。除此之外,还应调整发电储备,以捕捉间歇性影响,由于许多国家使用快速热电厂作为这些储备的一部分,机组承诺和斜坡约束也变得更加重要。在本文中,我们提出了一个MILP扩展规划模型,可以表示每小时的时间步长,同时保持合理的计算时间,投资和运营问题同时解决。由于规划范围很长(几十年),在单个最优化问题中的整个范围的解决方案对于大型实际系统在计算上是不可行的,因此,有必要在较小的子范围中应用范围分解启发式,并使用典型日期和季节的表示来减小问题的大小。
英文摘要:
The penetration of variable renewable energy (VRE) in electrical systems has changed the way the expansion planning is treated. This kind of resource has great variability in small amounts of time, which makes it important to represent hourly constraints that require chronology. Besides that, the generation reserves should also be adjusted in order to capture the intermittent effect, and since many countries use rapid thermal plants as part of these reserves, unit commitment and ramp constraint have also become more significant. In this paper, we propose a MILP expansion planning model that can represent hourly time steps while maintaining reasonable computational times, where both investment and operation problems are simultaneously solved. Because the planning horizons are long (decades), the resolution of the entire horizon in a single optimization problem would be computationally infeasible for large real systems, making it necessary, therefore, to apply a horizon decomposition heuristic in smaller sub-horizons, and use the representation of typical days and seasons to reduces the size of the problem.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。