arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 1903.09576math.NAcs.NA
收藏

基于集合平滑器的数据空间反演

Data-Space Inversion with Ensemble Smoother

Mateus M. Lima, Alexandre A. Emerick, Carlos E. P. Ortiz

AI总结:

本文提出基于迭代集合平滑器的数据空间反演方法,直接更新先验模型集合的预测以同化生产历史,避免更新模型本身,并通过实例和实际油田验证其比基于主成分分析的DSI更快、更稳健。

摘要:

油藏工程师使用大规模数值模型来预测油气田的生产动态。然而,这些模型是基于稀缺且往往不准确的数据构建的,使得其预测具有高度不确定性。另一方面,在油田运行过程中,压力和流量的测量数据被持续采集。将这些数据同化到油藏模型中(历史拟合)有助于降低不确定性并提高其预测能力。历史拟合是一个非线性反问题,通常使用优化方法和蒙特卡洛方法来处理。然而,在实践中,生成一组经过适当历史拟合且保持地质真实性的模型非常具有挑战性,尤其是在先验描述复杂的情况下,例如含有裂缝和复杂相分布的模型。最近,文献中引入了一种新的数据空间反演(DSI)方法,作为历史拟合中使用的模型空间反演的替代方案。其基本思想是直接更新来自先验模型集合的预测,以考虑观测到的生产历史,而无需更新相应的模型。本文介绍了一种基于迭代集合平滑器的DSI实现,并通过示例证明,与基于主成分分析的早期方法相比,新实现计算速度更快且更稳健。新的DSI还被应用于估计一个具有长期生产历史和大量井的实际油田的生产预测。对于该油田问题,新的DSI获得的预测结果与更传统的基于集合的历史拟合方法相当。

英文摘要:

Reservoir engineers use large-scale numerical models to predict the production performance in oil and gas fields. However, these models are constructed based on scarce and often inaccurate data, making their predictions highly uncertain. On the other hand, measurements of pressure and flow rates are constantly collected during the operation of the field. The assimilation of these data into the reservoir models (history matching) helps to mitigate uncertainty and improve their predictive capacity. History matching is a nonlinear inverse problem, which is typically handled using optimization and Monte Carlo methods. In practice, however, generating a set of properly history-matched models that preserve the geological realism is very challenging, especially in cases with complicated prior description, such as models with fractures and complex facies distributions. Recently, a new data-space inversion (DSI) approach was introduced in the literature as an alternative to the model-space inversion used in history matching. The essential idea is to update directly the predictions from a prior ensemble of models to account for the observed production history without updating the corresponding models. The present paper introduces a DSI implementation based on the use of an iterative ensemble smoother and demonstrates with examples that the new implementation is computationally faster and more robust than the earlier method based on principal component analysis. The new DSI is also applied to estimate the production forecast in a real field with long production history and a large number of wells. For this field problem, the new DSI obtained forecasts comparable with a more traditional ensemble-based history matching.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑