arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1809.00548math.OC
收藏

Resource constrained shortest path algorithm for EDF short-term thermal production planning problem

Markus Kruber, Axel Parmentier, Pascal Benchimol

英文摘要:

Unit commitment problem on an electricity network consists in choosing the production plan of the plants (units) of a company in order to meet demand constraints. It is generally solved using a decomposition approach where demand constraints are relaxed, resulting in one pricing subproblem for each unit. In this paper we focus on the pricing subproblem for thermal units at EDF, a major French electricity producer. Our objective is to determine an optimal two-day production plan that minimizes the overall cost while respecting several non-linear operational constraints. The pricing problem is generally solved by dynamic programming. However, due to the curse of dimensionality, dynamic programming reaches its limits when extra-constraints have to be enforced. We model the subproblem as a resource constrained shortest path (RCSP) problem. Leveraging on RCSP algorithms recently introduced by the second author, we obtain an order of magnitude speed-up with respect to traditional RCSP algorithms.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑