水电调度optimization的连续化方法
A continuation approach to the optimization of hydropower operations
摘要:
水轮机的瞬时发电量与水头差和水轮机流量的乘积成正比。因此,将功率与液压变量相关联的方程是非线性的。因此,服从这种关系的最优化问题,如发布计划优化,是非凸的,并且可能允许多个局部孤立的最小值。这使得这样的问题对于在操作模型预测控制中的使用是有问题的。本文表明,释放计划最优化问题的非线性涡轮发电方程可以建立使用连续的方法是零凸和路径稳定。以这种方式,这样的最优化问题变得适合于基于模型预测控制的决策支持系统。一个例子的问题进行了研究,它表明,显着的生产率提高,可以实现使用所提出的方法。
英文摘要:
The instantaneous power generation from a hydroelectric turbine is proportional to the product of head difference and turbine flow. The equation relating power to hydraulic variables is therefore nonlinear. Hence, optimization problems subject to this relation, such as release schedule optimization, are nonconvex and may admit multiple local isolated minima. This renders such problems problematic for use in operational model predictive control. This paper shows that release schedule optimization problems subject to the nonlinear turbine generation equation may be set up using a continuation approach to be both zero-convex and path stable. In this way such optimization problems become suitable for decision support systems based on model predictive control. An example problem is studied, and it is shown that significant productivity gains may be realized using the presented methodology.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。