稳健的动态输电和可再生能源发电扩展规划:迈向可持续系统

Robust Dynamic Transmission and Renewable Generation Expansion Planning: Walking Towards Sustainable Systems

Cristina Roldán, Agustín A. Sánchez de la Nieta, Roberto Mínguez, Raquel García-Bertrand

摘要:

如今,从传统发电系统到可再生发电系统的过渡是系统运营商和公司面临的最困难的挑战之一。有几个原因:投资决策的长期影响,可再生能源与系统的适当整合,当前和未来的不确定性,以及考虑不确定性和投资决策的综合逐年代表性的便利性。然而,最近在动态传输网络扩展规划(DTNEP)的突破表明,使用鲁棒优化可能会使这个问题的计算实际系统的易处理。本文不仅要考虑线路的容量扩展,还要考虑可再生和常规发电设施的建设和/或拆除。将动态输电网和可再生能源发电规划问题转化为一个三层自适应鲁棒最优化问题。第一层最小化输电网络和发电扩展规划的投资成本,第二层最大化系统的不确定参数的运行成本,而第三层最小化这些运营成本的运营决策。该方法被测试为两种情况下:i)一个说明性的例子,基于Garver IEEE系统和ii)使用IEEE 118节点系统的案例研究。从这些例子的数值结果表明,所提出的模型可以实现可持续的电力系统的最佳决策,同时克服了现实情况下的问题大小的限制和计算的棘手性。

英文摘要:

Nowadays, the transition from a conventional generation system to a renewable generation system is one of the most difficult challenges for system operators and companies. There are several reasons: the long-standing impact of investment decisions, the proper integration of renewable sources into the system, the present and future uncertainties, and the convenience to consider an integrated year-by-year representation of both uncertainties and investment decisions. However, recent breakthroughs in Dynamic Transmission Network Expansion Planning (DTNEP) have demonstrated that the use of robust optimization might render this problem computationally tractable for real systems. This paper intends to consider not only the capacity expansion of lines, but the construction and/or dismantling of renewable and conventional generation facilities as well. The Dynamic Transmission Network and Renewable Generation Expansion Planning (DTNRGEP) problem is formulated as an adaptive robust optimization problem with three levels. First level minimizes the investment costs of transmission network and generation expansion planning, the second level maximizes system operational costs with respect to uncertain parameters, while the third level minimizes those operational costs with respect to operational decisions. The method is tested for two cases: i) an illustrative example based on Garver IEEE system and ii) a case study using the IEEE 118-bus system. Numerical results from these examples demonstrate that the proposed model allows making optimal decisions towards reaching a sustainable power system, while overcoming problem size limitations and computational intractability for realistic cases.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑