加蓬可持续水电规划

Sustainable Hydropower Planning in Gabon

Rafael Kelman, Taina Martins Cunha, Luiz Rodolpho Sauret Cavalcanti de Albuquerque, Marcelo Gomes Metello, Tarcisio Luiz Coelho de Castro

摘要:

水电是一种可再生、可控、灵活的电力来源。这些都是支持脱碳努力的工具性特征,作为不可控制和可变的可再生电力来源的推动者。有时,水力发电还伴随着多用途水库提供的其他服务,如供水、灌溉、航运、防洪和娱乐。尽管有这些好处,水电可能是一个两极分化的问题。大量规划和执行不力的项目为反对者提供了众多论据。大型和复杂的项目经常遭受成本过高和延误。直接影响是由于大面积洪水造成河流生态系统和周围生境的破坏,以及由于建造水坝和减少危及水生生物的沉积物运输造成河流的破碎。人口迁移和补偿问题一直是一个复杂的问题。水力发电项目也可能造成间接影响,例如与建造工人村、进出道路和输电线路有关的额外毁林。最后,水库也可能成为甲烷排放的重要来源,特别是在热带地区。本文提供了一种分析方法,可持续水电规划在流域规模称为HERA:水电和环境资源评估。HERA建立在三个主要组成部分,即评估,工程和优化,筛选和比较水电开发方案,以保证社会和环境目标,同时最大限度地提高上述经济效益。其目的是鼓励从早期阶段就开始透明和参与性的水电规划进程。经验表明,这种方法增加了取得更好和平衡结果的机会。介绍了加蓬奥果韦河流域的一个案例研究。

英文摘要:

Hydropower is a renewable, controllable, and flexible source of electricity. These are instrumental features to support decarbonization efforts, as an enabler of non-controllable and variable sources of renewable electricity. Sometimes hydropower is accompanied by other services provided by multipurpose reservoirs, such as water supply, irrigation, navigation, flood control and recreation. Despite all these benefits, hydropower can be a polarizing issue. A large sample of projects with poor planning and execution provides numerous arguments for its opponents. Large and complex projects frequently suffer overcost and delays. The direct impacts are related to the disruption of river ecosystems and surrounding habitats due to the flooding of large areas, and the fragmentation of rivers caused by the construction of dams and the reduction of sediment transport that impoverishes aquatic life. People displacement and compensation are always a complex issue. Hydropower projects can also cause indirect impacts, such as additional deforestation related to the construction of workers' villages, access roads and transmission lines. Finally, reservoirs may also become a significant source of methane emission, especially in tropical areas. This paper offers an analytical approach for sustainable hydropower planning at the river basin scale called HERA: Hydropower and Environmental Resource Assessment. Built on three main components, namely geoprocessing, engineering, and optimization, HERA screens and compares hydropower development alternatives to guarantee social and environmental objectives while maximizing mentioned economic benefits. It was designed to encourage a transparent and participatory hydropower planning process from the early stages. Experience has shown this approach increases the chances of better and balanced outcomes. A case study is presented in the Ogooue river basin in Gabon.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑