arXivDaily arXiv每日学术速递 周一至周五更新
感恩节,周五至周末无更新,大家顺遂。周一再来吧
arXiv 1701.02729cs.SImath.OC
收藏

数字广告流量运营:流量管理分析

Digital Advertising Traffic Operation: Flow Management Analysis

Massimiliano Dal Mas

摘要:

在网络广告流量运营中,流量路由问题(TRP)包括以最有效的方式在流量活动之间安排网络广告(Adv)活动的管理,以监督和管理与合作伙伴和内部团队的关系,通过整合和发布后管理期望,以确保每个利益相关者的成功。为了我们自己的利益,我们做了独立的研究项目,也通过具体的创新任务验证对平均工作时间宣布的“规格要求”的主要全球行业领先的广告公司。我们提出了一个混合线性规划(MILP)制定的端到端的管理活动的工作流程沿着预定的路径,并概括它包括替代路径,以监督和管理与合作伙伴和内部团队的细节为导向的关系,以实现上述目标。为了满足客户的KPI,我们考虑了一个目标函数,其中包括准时性指标(平均等待时间和完成时间),但也包括主要准时性指标(平均延迟和准时性能)。然后,我们调查他们的分析关系,在广告领域通过实验的基础上,从交通办公室的真实数据。我们发现,经典的准时指标是矛盾的减少等待时间的任务。我们提出了新的指标,用于对更广泛的团队的项目或流程变更进行综合分析,这些指标更具可持续性,但也与利益相关者更具相关性。我们还表明,流动的运动(先进的方式)是交通办公室的主要瓶颈,备用路径不能提高性能指标。

英文摘要:

In a Web Advertising Traffic Operation the Trafficking Routing Problem (TRP) consists in scheduling the management of Web Advertising (Adv) campaign between Trafficking campaigns in the most efficient way to oversee and manage relationship with partners and internal teams, managing expectations through integration and post-launch in order to ensure success for every stakeholders involved. For our own interest we did that independent research projects also through specific innovative tasks validate towards average working time declared on "specification required" by the main worldwide industry leading Advertising Agency. We present a Mixed Integer Linear Programming (MILP) formulation for end-to-end management of campaign workflow along a predetermined path and generalize it to include alternative path to oversee and manage detail-oriented relationship with partners and internal teams to achieve the goals above mentioned. To meet clients' KPIs, we consider an objective function that includes the punctuality indicators (the average waiting time and completion times) but also the main punctuality indicators (the average delay and the on time performance). Then we investigate their analytical relationships in the advertising domain through experiments based on real data from a Traffic Office. We show that the classic punctuality indicators are in contradiction with the task of reducing waiting times. We propose new indicators used for a synthesize analysis on projects or process changes for the wider team that are more sustainable, but also more relevant for stakeholders. We also show that the flow of a campaign (adv-ways) is the main bottleneck of a Traffic Office and that alternate paths cannot improve the performance indicators.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑