arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1603.02073physics.ins-dethep-ex
收藏

BESIII ETOF升级的电子系统测试

The test of the electronics system for the BESIII ETOF upgrade

Wang Xiaozhuang, Dai Hongliang, Wu Zhi, Heng Yuekun, Zhang Jie, Cao Ping, Ji Xiaolu, Li Cheng, Sun Weijia, Wang Siyu, Wang Yun

摘要:

提出了利用多间隙电阻板室(MRPC)对北京谱仪III(BESIII)端盖飞行时间(ETOF)进行升级改造,使其总时间分辨率达到80 ps。在整个电子学系统准备就绪后,进行了一些实验,如热辐射,辐照硬度和大电流束测试,以验证电子学的可靠性和稳定性。在BEPCII E3线上对电子学系统进行了在探测器上的测试,测试结果表明电子学系统达到了设计要求。

英文摘要:

It is proposed to upgrade the endcap time-of-flight (ETOF) of the Beijing Spectrometer III (BESIII) with multi-gap resistive plate chamber (MRPC), aiming at overall time resolution about 80 ps. After the entire electronics system is ready, some experiments, such as heat radiating, irradiation hardness and large-current beam tests,are carried out to certify the electronics' reliability and stability. The on-detector test of the electronics is also performed with the beam at BEPCII E3 line, the test results indicate that the electronics system fulfills its design requirements.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑