arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1507.03825math.OC
收藏

减少候选线路表以实现投入系统运行

Reducing the Candidate Line List for Practical Integration of Switching into Power System Operation

Mohammad Majidi-Qadikolai, Ross Baldick

摘要:

输电网络的优化运行是通过更有效地利用输电设施来提供额外需求的一种解决方案,而线路切换是实现这一目标的主要工具之一。在本文中,我们添加额外的约束条件的OPF制定限制的最大数量的开关操作在每小时的基础上的网络条件,并添加切换成本的目标函数表示额外的维护成本,由于频繁切换。我们还提出了一种算法,以消除不太重要的线路切换在不同的负载条件下,所以OPF与传输切换将更快地解决实时操作。它被应用到一个案例研究与几个操作小时。

英文摘要:

Optimized operation of the transmission network is one solution to supply extra demand by more efficient use of transmission facilities, and line switching is one main tool to achieve this goal. In this paper, we add extra constraints to OPF formulation to limit the maximum number of switching operations in every hour based on network conditions, and add switching cost in the objective function to represent extra maintenance cost as a result of frequent switching. We also propose an algorithm to remove less important lines for switching in different loading conditions, so OPF with transmission switching will be solved faster for real-time operation. It is applied to a case study with several operation hours.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑