arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1212.3233cs.DS
收藏

有限期联合补给问题的近似算法

Approximation Algorithms for the Joint Replenishment Problem with Deadlines

Marcin Bienkowski, Jaroslaw Byrka, Marek Chrobak, Neil Dobbs, Tomasz Nowicki, Maxim Sviridenko, Grzegorz Swirszcz, Neal E. Young

摘要:

联合补货问题(JRP)是供应链管理中的一个基本优化问题,主要研究如何优化从供应商到零售商的货物流动。随着时间的推移,为了响应零售商的需求,供应商通过仓库将订单运送给零售商。其目标是调度这些订单,使订货成本和零售商的等待成本之和最小化。我们研究的JRP-D,版本的JRP的最后期限,而不是等待成本的零售商施加严格的最后期限的近似性。我们研究了标准线性程序(LP)松弛的完整性间隙,给出了1.207的下限,更强的,计算机辅助的下限为1.245,以及上限和近似比为1.574。最好的上界和近似比是1.667;以前没有发表下限。对于所有需求周期长度相等的特殊情况,我们给出了上限为1.5,下限为1.2,并显示了APX硬度。

英文摘要:

The Joint Replenishment Problem (JRP) is a fundamental optimization problem in supply-chain management, concerned with optimizing the flow of goods from a supplier to retailers. Over time, in response to demands at the retailers, the supplier ships orders, via a warehouse, to the retailers. The objective is to schedule these orders to minimize the sum of ordering costs and retailers' waiting costs. We study the approximability of JRP-D, the version of JRP with deadlines, where instead of waiting costs the retailers impose strict deadlines. We study the integrality gap of the standard linear-program (LP) relaxation, giving a lower bound of 1.207, a stronger, computer-assisted lower bound of 1.245, as well as an upper bound and approximation ratio of 1.574. The best previous upper bound and approximation ratio was 1.667; no lower bound was previously published. For the special case when all demand periods are of equal length we give an upper bound of 1.5, a lower bound of 1.2, and show APX-hardness.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑