推迟补货:具有持有成本与积压成本的在线联合补货问题
Putting Off the Catching Up: Online Joint Replenishment Problem with Holding and Backlog Costs
AI总结:
针对同时含持有与积压成本的在线联合补货问题,提出基于贪心和对偶拟合的在线算法,一般情形达到30竞争比,并给出单物品3竞争算法。
摘要:
我们研究经典联合补货问题(Joint Replenishment Problem,JRP)的一种在线推广形式,该问题刻画供应链计划系统中订货成本、持有成本与积压成本之间的权衡。零售商随时间向供应商订购多种物品:每个请求对应零售商未来需要的某种物品,并具有到达时间和软截止时间。如果请求在截止时间之前得到服务,零售商将为该物品的每单位支付持有成本,直至截止时间;然而,如果请求在截止时间之后得到服务,零售商将为每单位支付积压成本。每次服务都会产生固定的联合服务成本,并且对服务中包含的每种物品产生固定的、依赖于物品的成本。这些固定成本与所订购每种物品的单位数量无关。目标是安排服务以满足所有在线请求,同时最小化服务成本、持有成本和积压成本之和。此前,针对两种特殊情形已经开发出常数竞争在线算法:截止时间等于到达时间的按订单生产版本(Buchbinder 等人,2013),以及持有成本为零且具有硬截止时间的按库存生产版本(Bienkowski 等人,2014)。我们这种同时具有持有成本和积压成本的一般模型此前尚未得到研究;即使在具有非零持有成本和硬截止时间的按库存生产版本中,也没有已知的在线算法。我们为同时包含持有成本和积压成本的一般版本在线 JRP 开发了一种新的在线算法,并证明其具有 30 竞争性。在此过程中,我们为单物品情形开发了一种 3 竞争算法,并以其为基础获得最终结果。我们的算法采用贪心策略,其竞争性通过对偶拟合分析得到证明。
英文摘要:
We study an online generalization of the classic Joint Replenishment Problem (JRP) that models the trade-off between ordering costs, holding costs, and backlog costs in supply chain planning systems. A retailer places orders to a supplier for multiple items over time: each request is for some item that the retailer needs in the future, and has an arrival time and a soft deadline. If a request is served before its deadline, the retailer pays a holding cost per unit of the item until the deadline. However, if a request is served after its deadline, the retailer pays a backlog cost per unit. Each service incurs a fixed joint service cost and a fixed item-dependent cost for every item included in a service. These fixed costs are the same irrespective of the units of each item ordered. The goal is to schedule services to satisfy all the online requests while minimizing the sum of the service costs, the holding costs, and the backlog costs. Constant competitive online algorithms have been developed for two special cases: the make-to-order version when the deadlines are equal to arrival times (Buchbinder et al., 2013), and the make-to-stock version with hard deadlines with zero holding costs (Bienkowski et al., 2014). Our general model with holding and backlog costs has not been investigated earlier, and no online algorithms are known even in the make-to-stock version with hard deadlines and non-zero holding costs. We develop a new online algorithm for the general version of online JRP with both holding and backlog costs and establish that it is 30-competitive. Along the way, we develop a 3-competitive algorithm for the single-item case that we build on to get our final result. Our algorithm uses a greedy strategy and its competitiveness is shown using a dual fitting analysis.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。