arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1205.6904cs.SE
收藏

瀑布式软件开发生存周期的仿真模型

A Simulation Model for the Waterfall Software Development Life Cycle

Youssef Bassil

摘要:

软件开发生存周期(简称SDLC)是设计、构建和维护信息和工业系统的方法论。到目前为止,存在许多SDLC模型,其中之一是瀑布模型,它包括五个阶段,依次完成,以开发软件解决方案。然而,软件系统的SDLC总是遇到问题和限制,导致严重的预算超支,延迟或暂停交付,以及客户不满意。这些缺陷的主要原因是项目主管没有明智地为SDLC的各种活动分配所需数量的工人和资源。因此,资源不足的一些SDLC阶段可能会被推迟;而资源过剩的其他阶段可能会被闲置,导致项目到达和交付之间的瓶颈,并导致无法按时和在预算范围内交付业务产品。本文提出了一个仿真模型的瀑布开发过程中使用的Simphony.NET仿真工具,其作用是帮助项目经理确定如何实现最大的生产力与最少的费用,工人和时间。它有助于最大限度地利用开发过程,使所有员工和资源始终保持忙碌,以跟上项目的到来,并减少浪费和空闲时间。作为未来的工作,其他SDLC模型,如螺旋和增量将被模拟,让项目管理人员选择使用多种软件开发方法。

英文摘要:

Software development life cycle or SDLC for short is a methodology for designing, building, and maintaining information and industrial systems. So far, there exist many SDLC models, one of which is the Waterfall model which comprises five phases to be completed sequentially in order to develop a software solution. However, SDLC of software systems has always encountered problems and limitations that resulted in significant budget overruns, late or suspended deliveries, and dissatisfied clients. The major reason for these deficiencies is that project directors are not wisely assigning the required number of workers and resources on the various activities of the SDLC. Consequently, some SDLC phases with insufficient resources may be delayed; while, others with excess resources may be idled, leading to a bottleneck between the arrival and delivery of projects and to a failure in delivering an operational product on time and within budget. This paper proposes a simulation model for the Waterfall development process using the Simphony.NET simulation tool whose role is to assist project managers in determining how to achieve the maximum productivity with the minimum number of expenses, workers, and hours. It helps maximizing the utilization of development processes by keeping all employees and resources busy all the time to keep pace with the arrival of projects and to decrease waste and idle time. As future work, other SDLC models such as spiral and incremental are to be simulated, giving project executives the choice to use a diversity of software development methodologies.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑