并网光伏系统储能容量确定
Storage Size Determination for Grid-Connected Photovoltaic Systems
AI总结:
针对并网光伏系统,提出一种确定电池储能临界容量($C_{ref}^c$)的方法,使得容量大于等于该值时总成本不变,小于时成本严格增加,并给出上下界及高效算法。
摘要:
本文研究了并网光伏系统中电池储能容量的确定问题。在我们的设置中,电力由光伏发电产生并用于满足负载需求。光伏产生的多余电力可存储在电池中供以后使用,若光伏发电和电池放电无法满足需求,则必须从电网购电。由于分时电价,也可以在电价低时从电网购电,并在电价高时售回电网。目标是使与电网购售电相关的成本和电池容量损失最小化,同时满足负载并降低从电网的峰值购电量。本质上,目标函数取决于所选的电池容量。我们想要找到一个唯一的电池容量临界值(记为$C_{ref}^c$),使得当电池容量大于或等于$C_{ref}^c$时总成本保持不变,而当电池容量小于$C_{ref}^c$时成本严格增加。我们获得了评估电池相对于从电网购电的经济价值的准则,提出了$C_{ref}^c$的下界和上界,并引入了一种计算其值的高效算法;这些结果通过仿真得到了验证。
英文摘要:
In this paper, we study the problem of determining the size of battery storage used in grid-connected photovoltaic (PV) systems. In our setting, electricity is generated from PV and is used to supply the demand from loads. Excess electricity generated from the PV can be stored in a battery to be used later on, and electricity must be purchased from the electric grid if the PV generation and battery discharging cannot meet the demand. Due to the time-of-use electricity pricing, electricity can also be purchased from the grid when the price is low, and be sold back to the grid when the price is high. The objective is to minimize the cost associated with purchasing from (or selling back to) the electric grid and the battery capacity loss while at the same time satisfying the load and reducing the peak electricity purchase from the grid. Essentially, the objective function depends on the chosen battery size. We want to find a unique critical value (denoted as $C_{ref}^c$) of the battery size such that the total cost remains the same if the battery size is larger than or equal to $C_{ref}^c$, and the cost is strictly larger if the battery size is smaller than $C_{ref}^c$. We obtain a criterion for evaluating the economic value of batteries compared to purchasing electricity from the grid, propose lower and upper bounds on $C_{ref}^c$, and introduce an efficient algorithm for calculating its value; these results are validated via simulations.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。