arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 1012.1755astro-ph.IM
收藏

H.E.S.S.的拓扑第二层触发器第二相位望远镜

The topological second-level trigger of the H.E.S.S. phase 2 telescope

Y. Moudden, A. Barnacka, J-F. Glicenstein, P. Venault, D. Calvet, M. Vivier, G. Fontaine

摘要:

H.E.S.S是一个大气切伦科夫望远镜阵列,致力于GeV-TeV伽马射线天文学。最初的阵列自2004年初以来一直在运作。它由四个直径12米的望远镜组成。第五架28米直径望远镜的安装工作即将完成。该望远镜将在立体模式和单视场模式下工作,即在较小的望远镜上没有重合检测。第二级触发系统需要抑制28米望远镜在单视场模式下操作时的假触发。本文给出了二级触发器的动机和原理。通过一个示例算法说明了操作原理。H.E.S. S二级触发系统的硬件实现。描述了第2阶段,然后评估了其预期性能。

英文摘要:

H.E.S.S is an array of atmospheric Cherenkov telescopes dedicated to GeV-TeV gamma-ray astronomy. The original array has been in operation since the beginning of 2004. It is composed of four 12-meter diameter telescopes. The installation of a fifth 28-meter diameter telescope is being completed. This telescope will operate both in stereoscopic mode and in monoscopic mode i.e. without a coincident detection on the smaller telescopes. A second-level trigger system is needed to supress spurious triggers of the 28-meter telescope when operated in monoscopic mode. This paper gives the motivation and principle of the second-level trigger. The principle of operation is illustrated by an example algorithm. The hardware implementation of the second level trigger system of H.E.S.S. phase 2 is described and its expected performances are then evaluated.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑