充满活力的探索者计划
A Vigorous Explorer Program
摘要:
探险家们在天体物理学的许多领域都取得了突破。这两项任务的科学成果为三项诺贝尔奖做出了贡献--贾科尼(2002年)、马瑟和斯穆特(2006年)。探险家有:标志着精确宇宙学的决定性开端,发现短伽马射线暴是由致密恒星合并引起的,并测量了红移z>6的金属度。NASA探索者做尖端科学,不能做的设施级仪器。探索者计划对不断变化的科学和技术做出快速反应,以适度的成本实现尖端科学。探索者还促进创新,吸引和训练科学家、管理人员和工程师,为NASA和国家增加人力资本。目前正在实现的天体物理学探索者发射率为每3年1次,未来五年的预算预测为每年1.5亿美元。一个新的充满活力的探索者计划应创建:1。实现长期以来的年度天体物理发射目标; 2。为探索者寻找更多的发射选择,并积极鼓励节省发射器和航天器的成本,例如新的商用车辆和创新的伙伴关系。3.通过更强大的技术开发和亚轨道计划以及更长、更彻底的A阶段计划来降低风险,可能会减少30%的应急需求; 4.努力保护已达到B阶段的任务的资金,防止重大发射失误和取消,目标是从B阶段到发射的4至5年时间;审查项目管理程序和要求,以寻求降低成本,包括风险管理战略以及审查和报告程序; 6.审查并可能修改所有资源管理器类的成本上限,以优化每美元的科学回报。[删节]
英文摘要:
Explorers have made breakthroughs in many fields of astrophysics. The science from both these missions contributed to three Nobel Prizes - Giacconi (2002), Mather, and Smoot (2006). Explorers have: marked the definitive beginning of precision cosmology, discovered that short gamma-ray bursts are caused by compact star mergers and have measured metalicity to redshifts z>6. NASA Explorers do cutting-edge science that cannot be done by facility-class instruments. The Explorer program provides a rapid response to changing science and technology, to enable cutting-edge science at moderate cost. Explorers also enable innovation, and engage & train scientists, managers and engineers, adding human capital to NASA and the nation. The astrophysics Explorer launch rate now being achieved is 1 per 3 years, and budget projections are in the $150M/year range for the next five years. A newly Vigorous Explorer Program should be created to: 1. Reach the long-stated goal of annual astrophysics launches; 2. Find additional launch options for Explorers and actively encourage cost savings in launchers and spacecraft, such as new commercial vehicles and innovative partnerships. 3. Mitigate risk via stronger technical development and sub-orbital programs, and through longer, more thorough, Phase A programs, potentially reducing the need for a 30% contingency; 4. Strive to protect the funding for missions that have reached Phase B, to prevent significant launch slips and cancellations, with a goal of 4 to 5 years from Phase B to launch; 5. Review the project management procedures and requirements to seek cost reductions, including the risk management strategy and the review and reporting process; 6. Review and possibly modify the cost caps for all Explorer classes to optimize scientific returns per dollar. [ABRIDGED]
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。