arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 0705.3699nucl-ex
收藏

深地下科学与工程实验室的梯级方案

The Cascades Proposal for the Deep Underground Science and Engineering Laboratory

W. C. Haxton, J. F. Wilkerson

摘要:

创建深层地下科学与工程实验室(DUSEL)的选择之一是位于Mt.斯图尔特岩基,位于华盛顿州喀斯喀特山脉的花岗闪长岩和英云闪长岩。岩基在硬岩隧道方面有100年的历史,包括建造美国最长和最深的隧道,平行的喀斯喀特隧道和先锋隧道实验室计划将利用这两个隧道来建立一个具有许多理想特征的实验室,包括专用、清洁、水平通道、集装箱模块运输和低运营成本。场地的各个方面都有助于降低岩土工程、环境和安全风险。

英文摘要:

One of the options for creating a Deep Underground Science and Engineering Laboratory (DUSEL) is a site in the Mt. Stuart batholith, a granodiorite and tonalite rock mass in the Cascade mountain range in Washington State. The batholith's 100-year history in hard-rock tunneling includes the construction of the longest and deepest tunnels in the U.S., the parallel Cascade and Pioneer tunnels. The laboratory plan would utilize these two tunnels to produce a laboratory that has many desirable features, including dedicated, clean, horizontal access, container-module transport, and low operations costs. Various aspects of the site help to reduce geotechnical, environmental, and safety risks.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑