arXivDaily arXiv每日学术速递 周一至周五更新
arXiv physics/0411123physics.acc-phhep-ph
收藏

中微子工厂和β束实验与发展

The Neutrino Factory and Beta Beam Experiments and Development

C. Albright, V. Barger, J. Beacom, S. Brice, J. J. Gomez-Cadenas, M. Goodman, D. Harris, P. Huber, A. Jansson, M. Lindner, O. Mena, P. Rapidis, K. Whisnant, W. … 展开作者

C. Albright, V. Barger, J. Beacom, S. Brice, J. J. Gomez-Cadenas, M. Goodman, D. Harris, P. Huber, A. Jansson, M. Lindner, O. Mena, P. Rapidis, K. Whisnant, W. Winter, The Neutrino Factory, Muon Collider Collaboration

摘要:

在中微子领域充分探索三味混合的长期前景取决于对适当加速器研发的持续和增加的投资。两个新的概念已经提出,将彻底改变中微子实验,即中微子工厂和β束设施。这些新设施将极大地提高我们测试三味混合框架的能力,测量轻子扇区中的\textsl{CP}破坏,也许还能确定中微子质量等级,如果必要的话,还能探测混合角$θ_{13}$的极小值。描述了中微子工厂可以实现的惊人的灵敏度,以及我们目前对β束设施可能实现的相应灵敏度的理解。在β射束的情况下,需要进行额外的研究,以更好地了解最佳β射束能量和可实现的灵敏度。如果没有重大的研发工作,中微子工厂和β射线设施都不可能建成。在过去的几年里,美国和其他地方一直在进行令人印象深刻的中微子工厂研发工作,并在优化设计、开发和测试所需的加速器组件以及显着降低成本方面取得了重大进展。这里描述了最近的进展。

英文摘要:

The long-term prospects for fully exploring three-flavor mixing in the neutrino sector depend upon an ongoing and increased investment in the appropriate accelerator R&D. Two new concepts have been proposed that would revolutionize neutrino experiments, namely the Neutrino Factory and the Beta Beam facility. These new facilities would dramatically improve our ability to test the three-flavor mixing framework, measure \textsl{CP} violation in the lepton sector, and perhaps determine the neutrino mass hierarchy, and, if necessary, probe extremely small values of the mixing angle $θ_{13}$. The stunning sensitivity that could be achieved with a Neutrino Factory is described, together with our present understanding of the corresponding sensitivity that might be achieved with a Beta Beam facility. In the Beta Beam case, additional study is required to better understand the optimum Beta Beam energy, and the achievable sensitivity. Neither a Neutrino Factory nor a Beta Beam facility could be built without significant R&D. An impressive Neutrino Factory R&D effort has been ongoing in the U.S. and elsewhere over the last few years and significant progress has been made towards optimizing the design, developing and testing the required accelerator components, and significantly reducing the cost. The recent progress is described here.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑