arXivDaily arXiv每日学术速递 周一至周五更新
arXiv cs/9605104cs.AI
收藏

大规模调度问题的自适应求解方法研究

Adaptive Problem-solving for Large-scale Scheduling Problems: A Case Study

J. Gratch, S. Chien

摘要:

虽然大多数调度问题是NP难的,域特定的技术在实践中表现良好,但构造起来相当昂贵。在自适应问题求解中,领域特定的知识是自动获取的一般问题求解器具有灵活的控制架构。在这种方法中,一个学习系统探索一个空间的可能的探试法的一个很好地适合给定的域和问题分布的偏心。在这篇文章中,我们将讨论的方法调度卫星通信的应用。使用基于实际任务要求的问题分布,我们的方法确定的策略,不仅减少了生产时间表所需的CPU时间,但也增加了计算资源限制内可解决的问题的百分比。

英文摘要:

Although most scheduling problems are NP-hard, domain specific techniques perform well in practice but are quite expensive to construct. In adaptive problem-solving solving, domain specific knowledge is acquired automatically for a general problem solver with a flexible control architecture. In this approach, a learning system explores a space of possible heuristic methods for one well-suited to the eccentricities of the given domain and problem distribution. In this article, we discuss an application of the approach to scheduling satellite communications. Using problem distributions based on actual mission requirements, our approach identifies strategies that not only decrease the amount of CPU time required to produce schedules, but also increase the percentage of problems that are solvable within computational resource limitations.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑