arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2610.40444cs.AIcs.CL
收藏

前缀可执行性:超越最终成功评估工具使用智能体

Prefix Executability: Evaluating Tool-Using Agents Beyond Final Success

Oracle AI(甲骨文人工智能部门)

Amir H. Rezaeian, Weiyi Sun, Yassine Benajiba, Dan Roth

AI总结:

该研究提出前缀可执行性作为工具使用智能体的轨迹级评估协议,通过PEC等指标评估轨迹前缀可执行性,发现仅最终成功的评估存在缺陷,计划检查可提升可执行性并保持终端成功。

摘要:

工具使用基准通常根据最终任务成功与否对智能体进行评分,但终端结果可能会掩盖中间工具调用轨迹是否可执行。我们提出前缀可执行性作为工具使用智能体的轨迹级评估协议,该协议测量预测的工具调用序列的每个前缀在工具模式、状态前置条件和数据依赖下是否保持可执行性,并使用前缀可执行性曲线(PEC)、首错误深度(FED)、轨迹可执行性率(TER)、归一化到时间范围的AUC-PEC以及恢复率(RR)来总结可靠性。我们在BFCL-v3多轮对话和ToolSandbox的分层样本,以及τ³-bench的完整航空/零售基础拆分上实例化该协议。我们观察到仅基于结果和基于前缀的排名存在分歧:以未验证计划为条件执行的智能体通常比非计划条件的基线获得更高的点估计最终成功,同时显著降低TER和AUC-PEC。这些分歧正是前缀可执行性旨在揭示的失败模式:它们揭示了表面成功是否基于可执行轨迹、无效性首次出现的位置,以及成功是否来自早期失败的恢复。作为验证干预措施,显式的执行前计划检查可提高可执行前缀的存活率,同时保持有竞争力的终端成功。这些结果表明,仅最终成功不足以评估工具使用智能体,而前缀级可执行性为比较智能体、诊断失败和评估验证机制提供了可操作的可靠性信号。

英文摘要:

Tool-use benchmarks often score agents by final task success, but terminal outcomes can obscure whether the intermediate tool-call trajectory was executable. We propose prefix executability as a trajectory-level evaluation protocol for tool-using agents. The protocol measures whether every prefix of a predicted tool-call sequence remains executable under tool schemas, state preconditions, and data dependencies, and summarizes reliability using Prefix Executability Curves (PEC), First-Error Depth (FED), Trajectory Executability Rate (TER), horizon-normalized AUC-PEC, and Recovery Rate (RR). We instantiate the protocol on stratified samples from BFCL-v3 multi-turn and ToolSandbox, and on the complete Airline/Retail base splits of $τ^3$-bench. We observe that outcome-only and prefix-level rankings diverge: agents whose execution is conditioned on an unverified plan often achieve higher point-estimate final success than non-plan-conditioned baselines while substantially lowering TER and AUC-PEC. These divergences are precisely the failure modes that prefix executability is designed to expose: they reveal whether apparent success rests on an executable trajectory, where invalidity first enters, and whether success follows recovery from an earlier failure. As a validation intervention, explicit pre-execution plan checking can improve executable-prefix survival while maintaining competitive terminal success. These results show that final success alone is insufficient for evaluating tool-use agents and that prefix-level executability provides an actionable reliability signal for comparing agents, diagnosing failures, and assessing validation mechanisms.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑