arXivDaily arXiv每日学术速递 周一至周五更新
arXiv周末暂无论文更新,休息一下吧,周末愉快~~
arXiv 2610.22022physics.soc-ph
收藏

评估拟议的Scope 2基于市场核算的时空匹配:小时匹配与更严格地理约束下的排放、成本及政策权衡

Evaluating Proposed Spatiotemporal Matching for Scope 2 Market-based Accounting: emissions, cost, and policy tradeoffs for hourly matching and tighter geographic constraints

Electric Power Research Institute(电力研究协会);Watershed Technology, Inc.(Watershed Technology公司)

Daniel Livengood, Arin Kaye, Nils Johnson, John Bistline, Aranya Venkatesh, Bailie Neary, Adam Diamant

AI总结:

本研究通过集成容量扩张模型,分析了Scope 2基于市场核算中更严格时空约束对自愿无碳电力采购的排放、成本影响,发现地理范围更窄的可交付区域可实现更大减排但推高成本,且区域成本差异会影响负荷选址决策。

摘要:

企业自愿电力采购占清洁能源投资的很大份额,但电力及相关排放核算规则存在争议。更严格的无碳电力时空约束是否会大幅减少排放,还是主要提高合规成本,目前尚不明确。本研究采用集成容量扩张模型,结合可交付区域和政策背景的灵活替代情景,分析显示在大多数情景中,地理范围更窄的可交付区域与更大的 consequential 减排量及更高的 EAC 价格相关。全国层面结果显示,在参考技术情景中,模型优先部署带碳捕集与封存(CCS)的天然气以满足新的自愿无碳电力(CFE)需求;在带碳捕集与封存的天然气不可用的有限技术情景中,则部署风能和太阳能资源。各区域在不同情景下的 CO₂ 减排成本存在差异,在有限技术假设和精细空间边界下,EAC 价格最高。自愿 CFE 采购的区域成本差异可能对未来负荷选址决策或现有负荷的 CFE 匹配采购产生影响。这些发现强调了明确界定可交付区域对塑造自愿 CFE 采购的排放影响和成本的重要性。

英文摘要:

Corporate voluntary electricity procurement represents a large share of clean energy investment, yet accounting rules for the electricity and associated emissions claims are contested. Whether tighter spatiotemporal constraints on carbon-free electricity would substantially reduce emissions or primarily raise compliance costs is unknown. Using an integrated capacity expansion model with flexible alternate scenarios of deliverability zones and policy contexts, this analysis suggests that across most scenarios, geographically narrower deliverability zones are associated with greater consequential emissions reductions along with higher EAC prices. National results show that in the Reference Technology scenario, the model preferentially deploys natural gas with CCS to meet new CFE demand. In the Limited Technology scenarios where natural gas with CCS is unavailable, wind and solar resources are deployed. Individual regions show varying costs of CO2 abatement under the scenarios, with the highest EAC prices occurring under Limited Technology assumptions and Fine spatial boundaries. This regional cost variation for CFE procurement could have implications for future load siting decisions or for which existing loads CFE will be procured to match. These findings highlight the importance of clearly defining deliverability zones in shaping both the emissions impact and cost of voluntary CFE procurement.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑