arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2610.15191cs.AIcs.CYcs.MA
收藏

基于持续风险的食品安全检查调度:整合历史衰减与事件驱动的消费者评论信号

Continuous Risk-Based Scheduling for Food Safety Inspection: Integrating Historical Decay with Event-Driven Consumer Review Signals

Akriti Bhat, Wayne Zhu, Ishan Gupta

AI总结:

本研究提出CIR系统,整合衰减加权历史评分与语言模型筛选的实时消费者评论,实现食品安全检查动态调度,可提升害虫停业预测性能与精确率,为公共卫生系统提供可复现基准。

摘要:

基于批次风险的检查调度难以检测一类关键故障:近期通过检查但随后出现严重违规的食品设施。传统系统在固定计划周期内使用静态历史数据重新计算风险,在检查周期之间存在盲区。为解决该问题,我们提出了持续检查风险(Continuous Inspection Risk, CIR)系统,这是一种事件驱动的调度管道,可在新数据到达时动态重新排序检查队列。CIR将衰减加权的历史评分与语言模型分类器筛选的实时消费者评论流相结合。一项关键的结构性贡献是我们的时间分区规则,该规则严格排除最近一次检查之前的评论,以防止过时信号扭曲当前风险。在加利福尼亚州圣克拉拉县2024-2026年的9505次常规检查中对CIR进行评估,结果显示,在30%的检查预算下,仅基于历史的评分可将重大违规的平均检测时间缩短69天(20.9%),但无法预测与害虫相关的严重停业(8起中0起被检测到)。纳入检查后评论信号可大幅提升性能,在8起害虫停业中预测到7起,平均提前期为117天,其中4起在评论发布当天就触发了响应。引入评论佐证规则可将精确率从0.70提升至0.78,同时召回率未下降。最后,我们分析了关键的实施挑战,记录了一个数据卫生陷阱(检查边界间的过时评论泄漏)和一个涉及未被观察到的设施自我整改的评估局限。本研究提供了首个使用公开数据进行事件驱动检查触发的案例级评估,并为基于评论增强的公共卫生系统提供了可复现的基准。

英文摘要:

Batch risk-based inspection scheduling struggles to detect a critical failure class: food facilities with recent clean inspections that subsequently develop severe violations. Traditional systems recompute risk on fixed planning cycles using static historical data, leaving blind spots between inspection cycles. To address this, we introduce the Continuous Inspection Risk (CIR) system, an event-driven scheduling pipeline that re-ranks the inspection queue dynamically as new data arrives. CIR combines a decay-weighted historical score with a stream of real-time consumer reviews triaged by a language-model classifier. A key structural contribution is our temporal partition rule, which strictly excludes reviews predating the most recent inspection to prevent superseded signals from skewing current risk. Evaluating CIR on 9,505 routine inspections in Santa Clara County, California (2024-2026), we show that history-based scoring alone reduces mean time-to-detection of major violations by 69 days (20.9%) under a 30% inspection budget, but fails to anticipate severe vermin-related closures (0/8 detected). Incorporating post-inspection review signals drastically improves performance, predicting 7 of 8 vermin closures with an average lead time of 117 days-firing on the exact day of review publication in four instances. Introducing a review corroboration rule improves precision from 0.70 to 0.78 without loss of recall. Finally, we analyze critical implementation challenges, documenting a data-hygiene pitfall (stale review leakage across inspection boundaries) and an evaluation limitation involving unobserved facility self-remediation. This work provides the first case-level evaluation of event-driven inspection triggering using open data and provides a reproducible benchmark for review-augmented public health systems

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑