arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2610.14264eess.SYcs.SY
收藏

电力系统中的超大规模数据中心集成:不确定性与多尺度变化

Large-Scale Data Center Integration in Power Systems: Uncertainty and Multi-Scale Variation

Harvard John A. Paulson School of Engineering and Applied Sciences, Harvard University(哈佛大学约翰·A·保尔森工程与应用科学学院);Texas A&M University(德克萨斯农工大学);Massachusetts Institute of Technology(麻省理工学院)

Le Xie, Dongjoo Kim, Qian Zhang, Grant Ruan, Paul L. Joskow

AI总结:

本研究针对电力系统中超大规模AI数据中心的集成问题,开发了关联可靠性与经济性的四象限分析框架,结合实测AI工作负载的频谱特征,为评估其系统层面的可靠性与成本影响提供了依据。

摘要:

超大规模人工智能(AI)数据中心正成为一类结构全新的电力需求形式。与传统负荷不同,它们表现为空间集中、处于输电层面的点负荷,部署周期短,且具有换流器主导的动态特性。其集成受两个关键特性支配:负荷实现的预测不确定性,以及从亚秒级到规划 horizon 的多尺度时间变化。我们开发了一个统一框架,通过四象限结构将可靠性和经济性与这些维度关联:(可靠性、经济性)×(不确定性、变化),该框架整合了概率资源充足性、发输电扩展、运行安全性和市场设计。来自公开生成式AI工作负载数据集的实测轨迹显示,GPU功率谱呈现强音调特性,而非平滑宽带行为:在训练步 cadence 处存在谐波梳状结构,推理过程中存在明显的亚秒级周期性。在这些轨迹中,主导方差带随工作负载类型变化(训练和离线推理对应秒级,在线推理对应数十秒及更长时间)。我们将此视为对实测工作负载的表征而非通用特征,并认为这类负荷需要频谱描述而非峰值需求描述。这些特征直接影响富换流器电网中的备用需求、爬坡产品、电压稳定性、穿越性能和谐波相互作用。综上,该分析框架和实证结果为评估跨规划和运行 horizon 的大型AI数据中心集成的可靠性和成本影响建立了系统层面的基础。

英文摘要:

Hyperscale artificial intelligence (AI) data centers are emerging as a structurally new class of electricity demand. Unlike conventional loads, they materialize as spatially concentrated, transmission-level point loads with rapid deployment timelines and converter-dominated dynamics. Their integration is governed by two defining properties: forecast uncertainty in load realization and multi-scale temporal variation spanning sub-seconds to planning horizons. We develop a unified framework that links reliability and affordability to these dimensions through a four-quadrant structure: (reliability, affordability) $\times$ (uncertainty, variation), which integrates probabilistic resource adequacy, generation and transmission expansion, operational security, and market design. Measured traces from a public generative-AI workload dataset show strongly tonal GPU power spectra rather than smooth broadband behavior: harmonic combs at the training-step cadence, and a distinct sub-second periodicity in inference. Across these traces the dominant variance band shifts with workload type (seconds for training and offline inference; tens of seconds and longer for online inference). We report this as a characterization of the measured workloads rather than a universal signature, and take it to indicate that such loads warrant a spectral description rather than a peak-demand one. These signatures directly affect reserve requirements, ramping products, voltage stability, ride-through performance, and harmonic interactions in converter-rich grids. Taken together, the analytical framework and empirical results establish a system-level basis for assessing the reliability and cost implications of large AI data center integration across planning and operational horizons.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑