300 kA 脉冲电源的实现
Implementation of a 300 kA Pulsed Power Supply
浏览论文内容
中文总结 AI 辅助
本文介绍LBNF中微子设施中300kA脉冲电源的实现,通过原型验证组件设计,并展示单单元及32单元系统的测试结果,确保30年寿命。
中文摘要 AI 辅助
长基线中微子设施(LBNF)将产生世界上最强烈的中微子束。虽然磁喇叭预计会被更换,但LBNF喇叭电源预计将使用项目整个寿命期,即30年。三个串联连接的磁喇叭需要300kA、800微秒的脉冲,以1.4 pps的速率聚焦束流。原型验证了组件选择和设计。将展示单个单元和完整32单元系统的测试结果。
英文摘要
The Long Baseline Neutrino Facility (LBNF) will produce the world's most intense neutrino beam. While the magnetic horns are expected to be replaced, the LBNF horn power supply is expected to last the lifetime of the project, 30 years. Three series connected magnetic horns will require a 300kA, 800$μ$s pulses at a rate of 1.4 pps to focus the beam. Prototyping proved the component choices and designs. Test results for a single cell and the full 32 cell system will be presented.
发表机构
- Fermi National Accelerator Lab(费米国家加速器实验室)
机构由 AI 辅助整理,请以论文原文为准。