arXivDaily arXiv每日学术速递 周一至周五更新
arXiv 2606.29038cs.MAcs.AI
收藏

度量聚合分歧:基于智能体的策略优化中隐藏的有效性威胁及其契约式补救

Metric Aggregation Divergence: A Hidden Validity Threat in Agent-Based Policy Optimization and a Contractual Remedy

Department of Politics and Public Administration(政治与公共行政系);The University of Hong Kong(香港大学);Department of Applied Social Sciences(应用社会科学系);The Hong Kong Polytechnic University(香港理工大学)

Ruiyu Zhang, Lin Nie, Xin Zhao

AI总结:

本文揭示基于智能体模型与多目标进化算法(ABM+MOEA)中因各阶段独立重实现度量聚合导致的“度量聚合分歧”(MAD)问题,通过流行病策略工具复现和实验证明其严重性,并提出“度量契约”作为统一接口的工程补救方案。

摘要:

度量聚合分歧(MAD)是指,在基于智能体的模型与多目标进化算法(ABM+MOEA)耦合的流水线中,不同阶段独立地重新实现如何从模拟轨迹中提取结果度量时产生的静默不一致性。与有意的分析选择不同,MAD 发生在流水线架构层面:每个阶段内部是一致的,只有当跨阶段输出进行比较时,不一致性才变得可见。对 EpidemiOptim(一个发表在 JAIR 上的流行病策略工具箱)的代码检查揭示了同行评审代码中三个结构上独立的聚合路径。对这一结构的忠实复现导致 64.2% 的独立运行中出现冠军分歧(n=500,95% CI:[59.9%,68.3%])。在 300 个种子的策略翻转实验中,分歧聚合导致优化器在 83% 的复现中推荐错误的冠军,平均福利差距为 2.19 单位,基尼不平等差距为 0.050 单位。在后续的推断审计中,249 个翻转种子中有 3 个跨越了显著性边界本身。一项互补的企业后续实验在近乎可比的排名下(rho = 0.991)产生了预测的零结果,而一项对 Lake Problem DPS 工作流的公开上游重运行显示,存档的已发表路径推荐达到联合阈值成功率为 0.401,而共享契约路径规则达到 0.552。我们引入了度量契约——一个在调度时在所有流水线阶段强制执行的单一共享可调用对象——作为补救措施。将其视为应用于跨阶段度量接口的标准工程规范,该契约通过约 3% 的运行时间开销从根本上消除了分歧。

英文摘要:

Metric aggregation divergence (MAD) is the silent inconsistency that arises when distinct pipeline stages in an agent-based model coupled with a multi-objective evolutionary algorithm (ABM+MOEA) independently re-implement how an outcome metric is extracted from simulation trajectories. Unlike deliberate analytical choices, MAD operates at the level of pipeline architecture: each stage is internally coherent, and the inconsistency becomes visible only when cross-stage outputs are compared. Code inspection of EpidemiOptim, a JAIR-published epidemic policy toolbox, reveals three structurally independent aggregation paths in peer-reviewed code. A faithful replication of this structure produces champion disagreement in 64.2% of independent runs (n=500, 95% CI: [59.9%, 68.3%]). In a 300-seed policy-flip experiment, divergent aggregation causes the optimizer to recommend the wrong champion in 83% of replications, with a mean welfare gap of 2.19 units and a Gini inequality gap of 0.050 units. In a follow-up inference audit, 3 of 249 flipped seeds cross the significance boundary itself. A complementary enterprise follow-up produces the predicted null under near-commensurable rankings (rho = 0.991), while a public upstream rerun of the Lake Problem DPS workflow shows that the archived published-path recommendation reaches joint-threshold success 0.401 whereas a shared contract-path rule reaches 0.552. We introduce the metric contract - a single shared callable enforced at dispatch time across all pipeline stages - as the remedy. Framed as standard engineering discipline applied to the cross-stage metric interface, the contract eliminates divergence by construction with approximately 3% runtime overhead.

机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。

↑