2005年至2023年期间研发计划及LP&CW EXFEL低温模组测试结果
Results of R&D Programmes and LP&CW EXFEL Cryomodule Tests in the Period from 2005 to 2023
AI总结:
本文回顾了2005-2006年启动的E-XFEL长脉冲和连续波运行模式研发计划,重点介绍了低温模组测试结果及其对设计的改进。
摘要:
在2005年和2006年,我们开始考虑E-XFEL长脉冲(LP)和连续波(CW)运行的可行性。所考虑的运行模式被假定为与短脉冲运行(SP)互补,短脉冲运行具有约1 ms的RF脉冲和10 Hz重复率,这在当时已被选择并在E-XFEL设施的TDR [1]中提出。这种运行模式源于先前提出的直线对撞机TESLA项目[2]。我们在2005年和2006年启动了几项研发计划,以实现占空比显著高于短脉冲模式(仍约为1%)的运行模式。在本报告中,我们简要介绍了启动的研发计划及其结果,特别强调了E-XFEL低温模组测试的结果,这些测试导致了设计的微小修改,并随后将这些低温模组应用于大型X射线FEL设施。
英文摘要:
In 2005 and 2006, we began to consider the feasibility of long-pulse (LP) and continuous-wave (CW) operation for the E-XFEL. The operation modes considered were assumed to be complementary to the short-pulse operation (SP), with ~1 ms RF pulses and a 10 Hz repetition rate, which at that time had already been chosen and presented in the TDR [1] of the E-XFEL facility. This operation mode originated from the previously proposed linear collider TESLA project [2]. We initiated several R&D programmes in 2005 and 2006 to enable operation modes with a duty factor significantly higher than that of the short-pulse mode, which is still approximately 1%. In this report, we briefly present the initiated R&D programmes and their results, with particular emphasis on the results of the E- XFEL cryomodule tests, which led to minor modifications of the design and subsequently to the implementation of these cryomodules in large-scale X-ray FEL facilities.
机构、总结、中文摘要均由AI分析而来,可能存在错误,请以论文正文为准。